The construction of the bridge shown in this video is part of a $350,000,000 project that upgrades and grade-separates 13 miles of US 31 between I-465 and Indiana State Road 38. The upgraded 13-mile stretch features 11 new interchanges and eliminates 32 traffic signals. The overall project was substantially completed in December 2015. This video shows time-lapse documentation of the construction of a concrete sidewalk at the intersection of US 31 and 116th Street in Carmel, Indiana.
The project is located at 39.9561826,-86.1573638.