The Increased Flow of a Railway Line by Repositioning of a Minimum Number of Axes Halts

Article Preview

Abstract:

The present work attempts to expose a method to increase the lines capacity. The problem to treat concerns the existing minimum number of halts ''Stops'' to reposition in order to obtain the optimum transport capacity. This applied method to a narrow way in the process of normalization allows to add to the gain capacity induces by normalization a surplus of flow. The repositioning of the halts is a correction at lower cost having for objective to differ in time the heavy investments to modernize and standardize completely a narrow-gauge line. Throughout the text the term halt ''stop'' means any establishment or equipment ensuring the cantonment on one line.

You might also be interested in these eBooks

Info:

Periodical:

Defect and Diffusion Forum (Volumes 326-328)

Pages:

388-393

Citation:

Online since:

April 2012

Export:

Price:

[1] Tkachenko V. I: Design and calculation of separate points in the design of new railway (Uch. posobie. -M.: RGOTUPS, 2008).

Google Scholar

[2] Kantor I. I: Basics ofresearchanddesignof railways: Scholastic. For technical schools and Colleges railway transport. (-M.: ICCICS Academy kniga, 2003. -288p).

Google Scholar

[3] Turbine I. V, Gavrilinkov A. V, Kanter I. I, Yakovliv B. V, Pozin V. A: Research and Exploration railways. (Moscow, Transportation, 1989).

Google Scholar

[4] Kozlov I. T: measures the level of rational move for the organization of inter section without Stopping on a narrow gauge railroad. (Moscow, Ed Trans way iron, 1964).

Google Scholar

[3] Tikhonkov K. K, Makarovitch A. M: The choice of optimal ways to operate the railway. (Moscow, 1964). Écouter Lire phonétiquement.

Google Scholar