Study of Construction Method on Sole-Hole Double Deck Tunnel

Article Preview

Abstract:

2D elasto-plastic finite element method was adopted to analyze the forced state of the surrounding rock and the tunnel lining in every step of the construction project for Fulongping double-decked tunnel. In the analysis,Mohr-Coulombs yield criterion was employed incoporating associated flow law to account for the elasto-plastic characteristics of materials. The tangent stiffness method was adopted to solve the equation of equilibrium, and the stresses which exceeded yielded point were adjusted.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 838-841)

Pages:

1405-1408

Citation:

Online since:

November 2013

Export:

Price:

* - Corresponding Author

[1] Qi Ma. Research Institute of Urban Rail Transit, in Chinese, Vol. 5. (2003), p.86.

Google Scholar

[2] Yitao Zhu. China Railway Science, in Chinese, Vol. 6. (2001), p.84.

Google Scholar

[3] Deming Wang, Jiacheng Li. The construction of Fuxing East Road South line Double-Decked Tunnel. Eastern Net-The Labor Newspaper, April 26th (1), in Chinese , (2003).

Google Scholar

[4] Shichang Pan, Mi Zhang, Wu hongqing. Numerical Method for tunnel mechanics. China Railway Publishing House, (1994), in press.

Google Scholar

[5] S. Dagic. Slope stability problems of the weak rocks in the Asarsuyu pass of the Anatolian motorway.Bulletin of engineering geology and the environment. Vol. 57(1998).

DOI: 10.1007/s100640050036

Google Scholar

[6] Sun Jun, Wang Bingjian. The finite element analysis for underground construction. in Chinese Tongji University Press, (1988), in press.

Google Scholar