Field Test Study on Cutting Obstacle Piles Directly by Shield Cutters

Article Preview

Abstract:

Shield cutting obstacle pile directly has significant economic and social benefits compared to traditional methods, however, the corresponding cutting technology is far from mature currently in the international. Based on the construction need of cutting 14 bridge piles with the diameter of 1.0~1.2 meters by Suzhou subway shield, the preliminary scheme of cutter configuration was studied and proposed first, and then the worlds first field test of shield cutting reinforced concrete piles was carried out, the effect and rule of shield cutters cutting piles were analyzed, and the cutter configuration scheme was verified and optimized. The test results indicate that the shell cutter is fit for cutting reinforced concrete pile, its cutting effect on rebar and concrete is shear cutting; In order to make rebar shorter, we should make the rebar be cut off instead of pulled off as possible as we can. The main damage form of shell cutter is alloy cracked. Cutting side pile produces more damage on shell cutter than cutting central pile. The shell cutter configuration scheme should not only satisfy the whole cutting ability and covering the entire cutting plane, but also to be favorable to fix rebar by surrounding concrete.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1433-1439

Citation:

Online since:

August 2013

Export:

Price:

[1] LIU Jianwei. Research on construction technology of shield passing through urban building pile foundation [J]. Railway Standard Design, 2010, 2(1): 113-118. (in Chinese).

Google Scholar

[2] XU Qianwei,ZHU Hehua,MA Xianfeng, et al. Pile underpinning and removing technology of shield tunnels crossing through group pile foundations of road bridges [J]. Chinese Journal of Geotechnical Engineering, 2012, 34(7): 1217-1226. (in Chinese).

DOI: 10.1201/9780203879986.ch63

Google Scholar

[3] Zhang Jiang. Chiseling off for segmental tunneling for metro works through the pile foundation [J]. China Municipal Engineering, 2006, 122 (4): 87-89. (in Chinese).

Google Scholar

[4] Pan Jian, and He Zhihu. Piles Foundation Underpinning of Bao'an Bridge in Shenzhen Subway Line 5[J]. Urban Mass Transit, 2010, 30 (9): 95-97. (in Chinese).

Google Scholar

[5] Fu Deming and Li Bihua. On construction technique of soft soil shield cutting directly reinforced concrete pile foundation[J] . China Municipal Engineering, 2010, 147 (7): 46-48. (in Chinese).

Google Scholar

[6] Yang Zihua and Zhong Zhiquan. . Construction of driving through pile foundation with slurry shield machine[J]. Construction Mechanization, 2007, 9: 51-53. (in Chinese).

Google Scholar

[7] Zheng Jian. . Renovation technology for TBM passing through pile foundation[J]. Building Construction, 2010, 32 (5): 391-393. (in Chinese).

Google Scholar

[8] Zheng Shixing. Construction technique of shield tunnel beneath the bridge pile [J]. Chinese Journal of Underground Space and Engineering. 2009, 5 (S2): 1619-1623. (in Chinese).

Google Scholar

[9] ZHU Weibin, HAN Shijian. Studies on construction risk source and typical accident of metro shield [M]. Guangzhou: Jinan University Press, 2009. (in Chinese).

Google Scholar

[10] Hou Kezhong, Bai Jiasheng, Sheng Linfeng, and Sun Jihui. Study and preparation on the special tool of tunneling shield[J]. Cemented Carbide. 2009, 26 (1): 24-28. (in Chinese).

Google Scholar