Empirical Factors Analysis in the Execution of House Building Projects

Article Preview

Abstract:

The aim of this research is to analyze the empirical factors (executive indexes) in a house building project which has governmental employer, based on the opinions of practitioners of the projects. As a case study, a 624 units house building project was selected in Shiraz city. Identifying the challenges and the advantages of this project can help us to improve and solve problems of many similar projects, which are being constructed all over the country. Twenty two practitioners of the project were surveyed, based on the executive indexes, using a questionnaire. The responses were classified in two categories: 1) Managers and Experts (M&E) and 2) Consultants and Contractors (C&C). The completed questionnaires were assessed and analyzed and the values of indexes were calculated separately, based on the ideas of both groups. It is found that there is a similarity between the ideas of the two groups in 25 indexes out of 30. Furthermore, the difference between five other indexes is small, based on both group's ideas. It may show the accuracy in completing the questionnaire and the accuracy of the methodology used. In this paper the results of this case study are presented and discussed.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1396-1401

Citation:

Online since:

October 2012

Export:

Price:

[1] S. Rezvanjoo. Project Managers Leadership Method, Reasons of Success in Project Managements. Journal of Project management. Issue No. 10. Tehran. (2008), pp.38-51.

Google Scholar

[2] Project Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK ®Guide). Forth Edition, (2008).

DOI: 10.1556/9789634545019

Google Scholar

[3] C. Hendrickson, Tung Au. Project Management for Construction. Fundamental Concepts for Owners, Engineers, Architects and Builders. First Edition. Prentice Hall. (1989).

Google Scholar

[4] M. R. Maghareh, S. Mohammadzadeh, E. Samiee Lari. Assessment of Executive in Architectural Projects. Applied Mechanics and Materials. Vols. 94 – 96. (2011), p.2270 – 2275.

DOI: 10.4028/www.scientific.net/amm.94-96.2270

Google Scholar

[5] M. R. Maghareh, S. Mohammadzadeh, F. Mohammad Alinejad. R. Maghareh. Evaluation of Management Indicators in Projects. 2nd International Conference on Construction and Project Management. IPEDR vol.15. IACSIT Press. Singapore. (2011).

Google Scholar