1887

Abstract

Summary

This article describes the main problem of a seismic crew operations in transit zones with ocean bottom cable (OBC) equipment. Required accuracy ensuring of receiving equipment layout. Online methods of vessel track course corrections at the time of pickup equipment is describes. This technique has significantly reduced the time of seismic work production. During of the seismic works, acoustic positioning is not carried out for all receiving points often. This primarily due is equipment high cost. Increasing accuracy of positioning sensors without acoustic positioning is carried out using the methods of interpolation receiver points coordinates, taking into account track of the vessel. Comparison of standard procedure of linear interpolation, as well as rationale use procedures for adjusting the receiver point position on the first break picking entry during the work in the OBC 3D modification.

Loading

Article metrics loading...

/content/papers/10.3997/2214-4609.201950004
2019-09-09
2024-04-27
Loading full text...

Full text loading...

References

  1. ГорбачевС.В., МаевП.А., ЕгоровА.А.
    О позиционировании пунктов приема и возбуждения при проведении транзитных сейсморазведочных работ с донным оборудованием //Приборы и системы разведочной геофизики. 2013. №3. С. 73–83
    [Google Scholar]
  2. РудаковА.В., ЛевицкийА.А., ПеленевЕ.В.
    Особенности позиционирования пунктов приема на предельном мелководье при проведении сейсморазведочных работ МОВ ОГТ 3D// Материалы Всероссийской научно-практической конференции с международным участием посвященной 80-летию основания Старооскольского ГРТ имени И.И. Малышева.2014. С. 153–156.
    [Google Scholar]
  3. BradWilson
    “Solving Problems in Land and Transition Zone Positioning”, Exploration Consultants Limited, Inc., SEG Annual Meeting, 1998.
    [Google Scholar]
  4. GorbachevS.V., MaevP.A., EgorovA.A.
    O positsionirovanii punktov priema i vozbuzhdeniya pri provedenii tranzitnich seismorazvedochnich rabot s donnim oborudovaniev //Pribori i sistemi razvedochnoy geofiziki. 2013. №3. P 73–83.
    [Google Scholar]
  5. RudakovA.V., LevitskiyA.A., PelenevE.V.
    Osobennosti positsionirovaniya punktov priema na predelnom melkovodie pri provedenii seismorazvedochnich rabot MOV OGT 3D //Materialy Vserossiyskoy nauchno-prakticheskoy konferencii s mezhdunarodnim uchastiem posvyashennoy 80-letiu osnovaniya Starooskolskogo GRT imeni I.I. Malysheva.2014. P. 153–156.
    [Google Scholar]
  6. BradWilson
    “Solving Problems in Land and Transition Zone Positioning”, Exploration Consultants Limited, Inc., SEG Annual Meeting, 1998.
    [Google Scholar]
http://instance.metastore.ingenta.com/content/papers/10.3997/2214-4609.201950004
Loading
/content/papers/10.3997/2214-4609.201950004
Loading

Data & Media loading...

This is a required field
Please enter a valid email address
Approval was a Success
Invalid data
An Error Occurred
Approval was partially successful, following selected items could not be processed due to error