The subject of the study in this paper is models and methods of optimization of the organization's project portfolio for the planning period, considering the effects of the previously made decisions. Project portfolio optimization is one of the responsible and complex tasks by company's top management solves. Based on the analysis of the known works in the field, the research purpose is described: to create a method that would allow solve the problem of multi-criteria project portfolio optimization for the planned period, considering the aftereffects of the previously made decisions. The research tasks are to enhance the method for solving the project portfolio optimization problem in terms of maximizing the difference between income and costs for all projects started during the planned period; to propose a method for solving the project portfolio optimization problem in terms of the social effects of projects that started during the planned period; create a method for solving the problem of project portfolio optimization for the planned period in a multi-criteria setting. There are the following results obtained in the paper. There is presents the mathematical model of the problem being solved, the problem objective functions include the difference between the receipt and expenditure of funds in time, the portfolio risks, and its implementation social effects. The mathematical model considers the provision of funds sufficiency for the implementation of projects in all periods, the required sequence of project implementation, and the mandatory inclusion of some projects in the portfolio for a given period. The problem under consideration belongs to the multi-criteria non-Markov dynamic discrete optimization problems. There is a proposed method for solving it in a multi-criteria formulation. The method is based on solving one criterion problem, and then a multi-criteria problem. The method is based on the minimax approach and implicit search.  There has been developed solving method for the problem of enterprise project portfolio optimization for the planned period following the profit criterion. In contrast to the existing methods, this method considers the constraints on debt absence and the aftereffects of the previously made decisions. The method served as the basis for creating risk and social effect optimization methods. A method for enterprise project portfolio optimization of the planned period is provided, which, unlike previous, considers the criteria of profit, risks, and social effect, the constraints on debt absence, and the aftereffect of the previously made decisions. That makes it possible to improve the quality of the generated portfolio.

Keywords


project portfolio; model; multi-criteria optimization; planned period; aftereffect; method

Full Text:

PDF

References


The standard for portfolio management. PMI Publ., 2017. 127 p.

Management of Portfolios. AXELOS Publ., 2011. 75 p.

ISO 21504: 2015. Project, program and portfolio management - Guidance on portfolio management. Geneva, ISO Publ., 2015. 13 p.

Sampath, S., Gel, E., Fowler, J. and Kempf, K., 2015. A Decision-Making Framework for Project Portfolio Planning at Intel Corporation. Interfaces, 2015, vol. 45, iss. 5, pp. 391-408. DOI: 10.1287/inte.2015.0809.

Elbok, G. and Berrado, A. Towards an Effective Project Portfolio Selection Process. In: Proceedings of the International Conference on Industrial Engineering and Operations Management, April 11-13. Rabat, 2017, pp. 2158-2169.

Canbaz, B. and Marle, F. Construction of project portfolio considering efficiency, strategic effectiveness, balance and project interdependencies. International Journal of Project Organisation and Management, 2016, vol. 8, iss. 2, pp. 103-126. DOI: 10.1504/IJPOM.2016.076389.

Saiz, M., Lostumbo, M., Juan, A. and Lopez‐Lopez, D. A clustering‐based review on project portfolio optimization methods. International Transactions in Operational Research, 2021, vol. 29, iss. 1, pp. 172-199. DOI: 10.1111/itor.129337.

Mohagheghi, V., Mousavi, S., Antuchevičienė, J. and Mojtahedi, M. Project portfolio selection problems: a review of models, uncertainty approaches, solution techniques, and case studies. Technological and Economic Development of Economy, 2019, vol. 25, iss. 6, pp.1380-1412. DOI: 10.3846/tede.2019.11410.

Kremmel, T., Kubalík, J. and Biffl, S., Software project portfolio optimization with advanced multiobjective evolutionary algorithms. Applied Soft Computing, 2011, vol. 11, iss. 1, pp. 1416-1426. DOI: 10.1016/j.asoc.2010.04.013.

Morris, P. and Pinto, J. The Wiley guide to project, program, and portfolio management. NJ, J. Wiley & Sons Publ., 2010. 368 p.

Liagkouras, K. Novel Multiobjective Evolutionary Algorithm Approaches with Application in the Constrained Portfolio Optimization. A dissertation for the degree of Doctor of Philosophy. University of Piraeus, Publ., 2015. 258 p.

Vacík, E., Špaček, M., Fotr, J. and Kracík, L. Project portfolio optimization as a part of strategy implementation process in small and medium-sized enterprises: a methodology of the selection of projects with the aim to balance strategy, risk and performance. Ekonomie a Management, 2018, vol. 21, no. 3, pp.107-123. DOI: 10.15240/tul/001/2018-3-007.

Raad, N. G., Shirazi, M. A., and Ghodsypour S. H. Selecting a portfolio of projects considering both optimization and balance of sub-portfolios. Journal of Project Management, 2020, vol. 5, pp. 1–16. DOI: 10.5267/j.jpm.2019.8.003.

Baker, N. and Freeland, J, Recent Advances in R&D Benefit Measurement and Project Selection Methods. Management Science, 1975, vol. 21, no. 10, pp. 1164-1175.

Eilat, H., Golany, B. and Shtub, A. Constructing and evaluating balanced portfolios of R&D projects with interactions: A DEA based methodology. European Journal of Operational Research, 2006, vol. 172, iss. 3, pp. 1018-1039. DOI: 10.1016/j.ejor.2004.12.001.

Wei, H., Niu, C., Xia, B., Dou, Y., and Hu, X. A Refined Selection Method for Project Portfolio Optimization Considering Project Interactions. Expert Systems With Applications, 2020, vol. 142, pp. 1-34. DOI: 10.1016/j.eswa.2019.112952.

Ghasemzadeh, F., Archer, N. and Iyogun, P. A Zero-One Model for Project Portfolio Selection and Scheduling. The Journal of the Operational Research Society, 1999, vol. 50, no. 7, pp. 745–755. DOI: 10.1057/palgrave.jors.2600767.

Dickinson, M. W., Thornton, A. C. and Graves, S. Technology portfolio management: optimizing interdependent projects over multiple time periods. IEEE Transactions on Engineering Management, 2001, vol. 48, iss. 4, pp. 518-527. DOI: 10.1109/17.969428.

Shou, Y. and Huang, Y. Combinatorial auction algorithm for project portfolio selection and scheduling to maximize the net present value. Journal of Zhejiang University SCIENCE C, 2010, vol. 11, pp. 562-574. DOI: 10.1631/jzus.C0910479.

Hassanzadeh, F., Modarres, M., Nemati, H. and Amoako-Gyampah, K. A robust R&D project portfolio optimization model for pharmaceutical contract research organizations. International Journal of Production Economics, 2014, vol. 158, pp. 18-27. DOI: 10.1016/j.ijpe.2014.07.001.

Shaverdi, M., and Yaghoubi, S. A technology portfolio optimization model considering staged financing and moratorium period under uncertainty. RAIRO-Operations Research, 2021, vol. 55, pp. 1487-1513. DOI: 10.1051/ro/2020036.

Kononenko, I., Korchakova, A. and Smolin, P. Projects Portfolio Optimization for the Planned Period with Aftereffect Consideration. Mathematical Modeling and Simulation of Systems. MODS 2019. Advances in Intelligent Systems and Computing, 2019, vol. 1019, pp. 234–242. DOI: 10.1007/978-3-030-25741-5_23.

Rihter, K. Dinamicheskie zadachi diskretnoj optimizacii [Dynamic discrete optimization problems]. Moscow, Radio i svjaz' Publ., 1985. 136 p.

Kononenko, I. and Korchakova, A. The Method of Solving the Non-Markov`s Problem of the Projects Portfolio Optimization for the Planned Period. Journal of Engineering Science and Technology Review, 2020, vol. 13, iss. 2, pp. 17-21. DOI: 10.25103/jestr.132.03.

Mihalevich, B. C., Volkovich, V. L. Vychislitel'nye metody issledovanija i proektirovanija slozhnyh sistem [Computational methods of research and design of complex systems]. Moscow, Nauka Publ., 1982. 286 p.

Kononenko, I. V. and Lutsenko S. Yu. Informacionnaja sistema vybora i formirovanija podhoda k upravleniju proektom. [The information system for a project management approach selection and formation]. Radioelektronni i komp'uterni sistemi – Radioelectronic and computer systems, 2020, no. 2(94), pp. 109-118. DOI: 10.32620/reks.2020.2.10.




DOI: https://doi.org/10.32620/reks.2022.1.05