Analyze of Occupational Health and Safety Risk Factors and Human Resource Quality on the Implementation of Building Construction using Fault Tree Analysis

Document Type : Original Article

Authors

1 Civil Engineering Department, Mercu Buana University Jakarta, Indonesia

2 Industrial Engineering Department, Mercu Buana University Jakarta, Indonesia

Abstract

Workplace accidents are a significant concern in construction projects, and their root causes must be identified and addressed to prevent future occurrences. One technique that can aid in this endeavor is Fault Tree Analysis (FTA), which can link several event sequences that result in other events. The research objectives of this study are to identify OHS risk factors and the quality of human resources in the construction of high-rise buildings in the Integrated Sports Psychology Building Project at the State University of Surabaya, evaluate the dominant OHS risk factors and human resources using the FTA method, and determine appropriate mitigation actions. The study was descriptive and analytical, and the results indicated that risk factors could be classified into five categories: Very Small, Small, Moderate, Large, and Very Large. The identified risks include non-compliance with safety procedures, lack of OHS training or certification for workers, unsafe working conditions, use of unsafe equipment, worker negligence, and inadequate personal protection or safety equipment. To reduce these risks, strict OHS standards and regulatory compliance, the use of safe equipment and technology, and careful worker selection and training are recommended. Routine inspection and evaluation, appropriate job placement, and competency development should also be implemented. Regular maintenance and inspection of concrete molds, compliance with construction regulations, and training on new technology are also needed to ensure project safety and success. In conclusion, the FTA method is an effective tool for identifying the root causes of workplace accidents and providing recommendations for their mitigation. The study provides insights into OHS risk factors and the quality of human resources in the construction of high-rise buildings, and its findings can be used to improve safety standards and practices in the construction industry.

Keywords


1-Alloysius Vendhi Prasmoro, Murwan Widyantoro, W., 2021, Analisis Penerapan Program Keselamatan Kerja Pada Lantai Produksi Dengan Metode FAULT TREE ANALYSIS ( Fta ) Di Analysis of Application Occupational Safety Program on the Production Floor With FAULT TREE ANALYSIS ( Fta ) Method, At Pt . Xyz, 21, 2, 75–82.
2- Asmawati, A. L., Juniani, A. I., and Dhani, R, 2017, Pemilihan Rekomendasi Menggunakan Bca, 2581, 699–704.
3-Bastuti, S., 2020, Analisis Risiko Kecelakaan Kerja Dengan Metode Failure Mode and Effect Analysis (Fmea) Dan FAULT TREE ANALYSIS (Fta) Untuk Menurunkan Tingkat Risiko Kecelakaan Kerja (Pt. Berkah Mirza Insani), Teknologi : Jurnal Ilmiah Dan Teknologi, 2, 1, 48. https://doi.org/10.32493/teknologi.v2i1.3909
4-Darmawan, D., Puspita, A. D., and Santosa, G., 2022, Analisis Keselamatan Dan Kesehatan Kerja Dengan Pendekatan Hazard Identification Risk Assessment and FAULT TREE ANALYSIS Pada PT. WGI, Journal of Industrial and Systems Optimization, 5, 1, 10–17.
5-Ginting, N. S. br, and Kristiana, R., 2020, Analisis Efektivitas Pengendalian Risiko Kecelakaan Kerja Pada Pekerja Proyek Konstruksi Menggunakan Metode Fine dan FAULT TREE ANALYSIS, Teknik, 41, 2, 192–200. https://doi.org/10.14710/teknik.v39i3.20265 Ilmiah, J., & Pendidikan, W. (2022). 3 1,2,3. 8(July), 365–378.
6-Kementerian Pekerjaan Umum RI., 2014, Peraturan Menteri Pekerjaan Umum Nomor 05/PRT/M/2014 Tentang Pedoman Sistem Manajemen Keselamatan Dan Kesehatan Kerja (SMOHS) Konstruksi Bidang Pekerjaan Umum, Peraturan Menteri Pekerjaan Umum, 41.
7-Lutolf, H., 1977, Turnover of piecegoods in fibre production.
8-Maddeppungeng, A., Mina, E., and Dewi, I. P., 2017, Pengembangan dan Uji Model Sumber Daya Proyek Kontruksi Terhadap OHS (Kesehatan dan Keselamatan Kerja) dan Kinerja Perusahaan (Studi Kasus : Proyek Pembangunan Kontruksi Offshore Provinsi Banten), Jurnal Fondasi, 6, 2, https://doi.org/10.36055/jft.v6i2.2475
9-Mariawati, A. S., Umyati, A., and Andiyani, F., 2017, Analisis penerapan keselamatan kerja menggunakan metode Hazard Identification Risk Assessment (HIRA) dengan pendekatan Fault Tree Anlysis (FTA), Industri Servicess, 3c, 1, 293–300. https://jurnal.untirta.ac.id/index.php/jiss/article/view/2108
10 -Nisa, T. F. A., Suyono, H., & Sukmawati, S., 2019, Identifikasi Risiko Faktor Kualitas Sumber Daya Manusia Menggunakan FAULT TREE ANALYSIS Method Pada Pelaksanaan Pembangunan Bangunan Tinggi, Journal Rekayasa Sipil Dan Lingkungan, 37–47.
11-Nur, M., and Ariwibowo, O., 2007, Sipp. Hawley’s Condensed Chemical Dictionary, 4, 1, 55–63. https://doi.org/10.1002/9780470114735.hawley14577
12-Nuriawati, L. and Ismara, K. I., 2018, Evaluasi Penerapan Keselamatan Dan Kesehatan Kerja ( OHS ) Berdasarkan FTA , FMEA Dan PHA Di Jurusan TITPL SMK Negeri 1 Magelang. 8, 6, 490–501. http://journal.student.uny.ac.id/ojs/index.php/mekatronika/article/viewFile/13596/pdf
13- Pasaribu, H. P., Setiawan, H., Ervianto, W. I., Magister, M., Sipil, T., Atma, U., Yogyakarta, J., Magister, D., Sipil, T., Atma, U., and Yogyakarta, J., 2017, Metode Failure Mode and Effect Analysis ( Fmea ) Dan FAULT TREE ANALYSIS ( Fta ) Untuk Mengidentifikasi Potensi Dan Penyebab, Manajemen Teknik.