TM 4: Beam through the Main Linac Cryomodule
- Brookhaven National Lab. (BNL), Upton, NY (United States)
On May 15th 2017, the CBETA project reached the major funding milestone, “Beam through the MLC.” For this test, the team had to successfully accelerate the electron beam to 6 MeV in the Injector Cryomodule (ICM), and then to a final energy of 12 MeV in the Main Linac Cryomodule (MLC). The MLC contains six superconducting accelerating cavities; for this initial test only a single cavity was powered.
- Research Organization:
- Brookhaven National Lab. (BNL), Upton, NY (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), Nuclear Physics (NP)
- DOE Contract Number:
- SC0012704
- OSTI ID:
- 1412726
- Report Number(s):
- BNL-114550-2017-IR
- Country of Publication:
- United States
- Language:
- English
Similar Records
TM 6: Fractional Arc Test - beam through MLC & girder
CEBAF Cryomodule Commissioning in the South Linac
Magnet design for the splitter/combiner regions of CBETA, the Cornell-Brookhaven Energy-Recovery-Linac Test Accelerator
Technical Report
·
Fri Apr 20 00:00:00 EDT 2018
·
OSTI ID:1412726
CEBAF Cryomodule Commissioning in the South Linac
Conference
·
Fri Oct 01 00:00:00 EDT 1993
·
OSTI ID:1412726
+6 more
Magnet design for the splitter/combiner regions of CBETA, the Cornell-Brookhaven Energy-Recovery-Linac Test Accelerator
Technical Report
·
Fri Jan 06 00:00:00 EST 2017
·
OSTI ID:1412726
+2 more