skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Beam-beam dynamics during the injection process at the PEP-II B-Factory

Technical Report ·
DOI:https://doi.org/10.2172/10106667· OSTI ID:10106667

This paper is concerned with beam-beam effects during the injection process at the proposed asymmetric SLAC/LBL/LLNL B-Factory based on PEP (PEP-2). For symmetric colliders, the primary source of the beam-beam effect is the head-on collision at the interaction point (IP), and this effect can be mitigated by separating the beams during the injection process. For an asymmetric collider, which intrinsically consists of two separate rings, the bunches not only collide at the IP but experience a long-range beam-beam force on the way into and out of the IP region. These collisions are called ``parasitic crossings (PC).`` The parasitic crossings emerge as a potential source of far stronger beam-beam impact during the injection process for the following reason. In the proposed injection scheme of the APIARY-6.3d design, the bunches are injected horizontally into the two rings with large horizontal offset of 8{sigma}{sub Ox}{sup sptm} where {sigma}{sub Ox}{sup sptm} is the nominal horizontal storage ring beam size at the end of the septum magnet. Then, the injected beam starts to travel around the ring oscillating horizontally. For the sake of discussion, let us assume that the beam in the other ring has already been fully stored. When the injected beam arrives at the 1st PC, where the two nominal orbits are separated horizontally by about 7.6 times the nominal horizontal beam size of the low energy ring, it may pass through the other beam far more closely than at the nominal separation distance, or it may even strike the other beam head-on.

Research Organization:
Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC03-76SF00098
OSTI ID:
10106667
Report Number(s):
LBL-31434; ON: DE92004097
Resource Relation:
Other Information: PBD: Oct 1991
Country of Publication:
United States
Language:
English

Similar Records

Beam-beam dynamics during the injection process at the PEP-II B-Factory
Technical Report · Tue Oct 01 00:00:00 EDT 1991 · OSTI ID:10106667

Beam-beam dynamics during the injection process at an asymmetric ring collider
Journal Article · Tue Dec 01 00:00:00 EST 1992 · Bulletin of the American Physical Society · OSTI ID:10106667

Parasitic crossing at an asymmetric B factory, APIARY
Conference · Wed May 01 00:00:00 EDT 1991 · OSTI ID:10106667