茨城講演会講演論文集
Online ISSN : 2424-2683
ISSN-L : 2424-2683
セッションID: 602
会議情報
602 原子力施設の免震技術の開発(その2) : 渡り配管要素試験(OS9 オーガナイズドセッション《振動・音響・制御》)
水野 琴世神保 雅一岡本 拓小杉 慎司松岡 真二尾西 重信
著者情報
会議録・要旨集 フリー

詳細
抄録

The Japanese government accepted utilizing seismic isolation technology for nuclear power plants with the 2006 revision to the Nuclear Power Plant Seismic Design Review Guidance. The public-private sectors formed a team in 2010 to begin development of a seismically isolated nuclear power plant using the existing lead rubber bearing. This paper focuses on the main steam crossover piping. A low cycle ratcheting fatigue test based on the relative displacement and inertia load by earthquake between the buildings was performed to confirm the failure modes and ultimate strength (i.e. fatigue life) of pipe elbow. As a result, the ultimate strength under combined loads was sufficiently higher than the design criteria and it was confirmed the structural integrity of the main steam crossover piping.

著者関連情報
© 2013 一般社団法人 日本機械学会
前の記事 次の記事
feedback
Top