構造工学論文集 A
Online ISSN : 1881-820X
地震工学
シールドとう道立坑接続部における突出現象の簡易判定手法に関する研究
山崎 泰司田中 宏司岩田 克司鈴木 崇伸
著者情報
ジャーナル フリー

2016 年 62A 巻 p. 280-290

詳細
抄録

When the Great Hanshin-Awaji Earthquake hit, some shield tunnels for telecommunication cable thrusted into vertical shafts, and water leakage occurred. Telecommunication cable tunnels, the most important facilities that have a large amount of cables in the urban area, should not get any damage that interrupt communication service by natural disasters such as earthquake. In this paper, we propose an estimation method and countermeasure against thrusting of a constructed shield tunnel. This estimation method uses vertical shaft's boring data, and this method is simple. This method is verified by the real damage of the Great Hanshin-Awaji Earthquake and the Great East Japan Earthquake. The countermeasure, on the other hand, is to install concrete base to drain pit, and it is economical and harmless to cable.

著者関連情報
© 2016 公益社団法人 土木学会
前の記事 次の記事
feedback
Top