Presentation + Paper
13 December 2020 Thirty Meter Telescope enclosure production readiness overview
Michael Gedig, Walter Brzezik, Lisa Crofoot, Amir Hossein Hadi, Amin Kadivar, Tony Li, Sina Niaki, Colin Vincent, Mehdi Jalayer
Author Affiliations +
Abstract
The enclosure for the Thirty Meter Telescope (TMT) uses a Calotte-style configuration, chosen for the advantages of a high degree of protection for the telescope, relatively low weight through the use of efficient shell structures, and a balanced shutter mechanical system. This design is unprecedented for large scale telescope enclosures, and introduces significant design, fabrication, construction and operation risks. This paper provides an overview of design development, analysis and testing work that was done to mitigate such risks. Compared to conventional enclosures, the combined moving mass of the cap and shutter represents a greater portion of the enclosure mass, increasing the risk of enclosure vibration impacts on telescope operation. The vibration risk was addressed through development of a self-steering bogie design, bogie spring design and testing, wheel and rail splice design and testing, and slow-speed motion simulation. Risks of rail damage at splices and bogie wheel bearing failures observed on existing observatories were also addressed by bogie and rail joint design. The bogie spring design and test program incorporated elastomeric materials that provide significant damping capability for structural seismic isolation while meeting bogie mechanical design requirements for load distribution and tracking. A novel approach to slow-speed rolling motion simulation in the stick-slip regime was developed with a view to better understand control and vibration impacts. A staged construction analysis and detailed installation sequence was completed, including falsework and erection aids. The activities described above have been performed as part of the recently completed Production Readiness design stage.
Conference Presentation
© (2020) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Michael Gedig, Walter Brzezik, Lisa Crofoot, Amir Hossein Hadi, Amin Kadivar, Tony Li, Sina Niaki, Colin Vincent, and Mehdi Jalayer "Thirty Meter Telescope enclosure production readiness overview", Proc. SPIE 11445, Ground-based and Airborne Telescopes VIII, 114450A (13 December 2020); https://doi.org/10.1117/12.2563253
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Thirty Meter Telescope

Camera shutters

Telescopes

Optical instrument design

Analytical research

Device simulation

Mechanical engineering

RELATED CONTENT

Transient aero-thermal simulations for TMT
Proceedings of SPIE (August 04 2014)
Enclosure design for Thirty Meter Telescope
Proceedings of SPIE (July 10 2008)
Enclosure of the Large Binocular Telescope
Proceedings of SPIE (June 01 1994)
Enclosure design status for Thirty Meter Telescope
Proceedings of SPIE (August 05 2010)

Back to Top