[1]
W. Alaghbari, M. Razali A. Kadir, A. Salim, and Ernawati, The significant factors causing delay of building construction projects in Malaysia,, Eng. Constr. Archit. Manag., vol. 14, no. 2, p.192–206, (2007).
DOI: 10.1108/09699980710731308
Google Scholar
[2]
T. Aksorn and B. Hadikusumo, Gap Analysis Approach for Construction Safety Program Improvement,, … Constr. Dev. Ctries., vol. 12, no. 1, p.77–97, (2007).
Google Scholar
[3]
R. Atkinson, Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria,, Int. J. Proj. Manag., vol. 17, no. 6, p.337–342, Dec. (1999).
DOI: 10.1016/s0263-7863(98)00069-6
Google Scholar
[4]
P. Govender and S. B. Parumasur, Organizational diagnosis, the stepping stone to organizational effectiveness,, Corp. Board Role, Duties Compos., vol. 12, no. 2Continued1, pp.65-76, (2016).
DOI: 10.22495/cbv12i2c1art1
Google Scholar
[5]
M.R. Weisbord, Organizational Diagnosis: Six Places To Look for Trouble with or Without a Theory,, Group & Organization Management, vol. 1, no. 4. p.430–447, (1976).
DOI: 10.1177/105960117600100405
Google Scholar
[6]
V.F. Salvatore, Organizational Diagnostic Models: A review & synthesis.,, p.43, (2008).
Google Scholar
[7]
T. Edition, I. Palmer, R. Dunford, and D. A. Buchanan, Managing Organizational Change. McGraw-Hill Education, (2009).
Google Scholar
[8]
A.G. Athos and H. Universi-, Waterman, R. H., Peters, T. J., & Phillips, J. R. (1980)..pdf.,.
Google Scholar
[9]
J.R. GALBRAITH, THE STAR MODEL,, (2007).
Google Scholar
[10]
L.G. Bolman and T.E. Deal, Reframing Organizations : Artistry, Choice, and Leadership (5th Edition).,, in Reframing organizations: Artistry, Choice, and Leadership, (2013).
DOI: 10.1002/9781119281856
Google Scholar
[11]
H.J. Leavitt, Applied organizational change in industry: structural, technological and humanistic approaches. Carnegie Institute of Technology, Graduate School of Industrial Administration, (1965).
Google Scholar
[12]
W.W. Burke and G. H. Litwin, A Causal Model of Organizational Performance and Change,, J. Manage., (1992).
Google Scholar
[13]
N.M. Tichy, Managing change strategically: The technical, political, and cultural keys,, Organ. Dyn., (1982).
Google Scholar
[14]
Engineering News-Record, 'The Top 250,', (2017).
Google Scholar
[15]
S.M. Salim, F. I. Romli, J. Besar, and N. O. Aminian, A Study on Potential Physical Hazards at Construction Sites,, J. Mech. Eng. Vol SI, vol. 4, no. 1, p.207–222, (2017).
Google Scholar
[16]
N.M.M. Rasidi, S. Abdullah, D.A. Wahab, R. Ramli, and R.M. Yassin, Assessing technique applicability towards ideation taxonomy for engineering design concept,, J. Mech. Eng., vol. 5, no. Specialissue3, (2018).
Google Scholar
[17]
A.S. Ali and I. Rahmat, The performance measurement of construction projects managed by ISO-certified contractors in Malaysia,, J. Retail Leis. Prop., vol. 9, no. 1, p.25–35, (2010).
DOI: 10.1057/rlp.2009.20
Google Scholar
[18]
C. Heap-Yih and N.P. Christopher, Improving Construction Procurement Systems using Organizational Strategies,, in Acta Polytechnica Hungarica, 2014, vol. 11, no. 1, p.1–16.
DOI: 10.12700/aph.11.01.2014.01.1
Google Scholar
[19]
T. Cooke-Davies, The 'real' success factors on projects,, Int. J. Proj. Manag., vol. 20, no. 3, p.185–190, Apr. (2002).
Google Scholar
[20]
A. Saleem and U. Ghani, Application Of Weisbord's Organizational Diagnosis Model: A Case of Pakistan Banking Industry,, Bus. Econ. Rev., vol. 5, no. 1, p.1–12, (2013).
Google Scholar
[21]
L.L. Tan, The internationalisation of Malaysian manufacturing small and medium enterprises,, (2008).
Google Scholar
[22]
Y. Cheong Yong and N. Emma Mustaffa, Analysis of factors critical to construction project success in Malaysia,, Eng. Constr. Archit. Manag., vol. 19, no. 5, p.543–556, (2012).
DOI: 10.1108/09699981211259612
Google Scholar
[23]
A. Rahim Abdul Hamid, N. Inayah Mohd Khazid, R. Yunus, H. A. Halim, and A. Raihan Abdul Razak, The emerging of employment gap in the Malaysian construction industry,, J. Phys. Conf. Ser., vol. 1049, no. 1, (2018).
DOI: 10.1088/1742-6596/1049/1/012033
Google Scholar
[24]
Abdul Rashid Abdul Aziz, Construction Entrepreneurship in Terengganu, Malaysia: An Exploration of the Influential Forces,, J. Eng. Des. Technol., vol. 1, no. 1, p.15–41, (2008).
DOI: 10.1108/eb060887
Google Scholar
[25]
A. Gupta, Environmental and pest analysis : An approach to external business environment,, Int. J. Mod. Soc. Sci. Humanit., vol. 1, no. 2, p.13–17, (2013).
Google Scholar
[26]
D. M. Taofeeq, A. Q. Adeleke, and A. K. Hassan, Factors Affecting Contractor ' s Risk Attitude from Malaysia Construction Industry Perspective,, Soc. Sci. Humanit. J. Factors, vol. 3, no. 1281, p.1281–1298, (2019).
Google Scholar