Abstract
Bid-rigging has long been a problem in the construction area. This research identified the existing problems in evaluating damages from bid-rigging in Design-Bid-Build (DBB) and lowest-bid construction projects. Traditional econometric assessment based on stochastics requires sufficient historical data to obtain reliable estimates. Thus, it is crucial to collect and analyze data from pertinent projects for its utilization. To ensure the accuracy of the estimation, a substantial amount of data on the outcomes of DBB bids should have been gathered. In many construction projects, that requirement could not be met. Furthermore, econometric analysis cannot reflect the differences caused by the details of individual projects. This study proposes an alternative approach based on detailed cost estimates, weights of major work groups and their historical bid rates when historical data from similar projects are scarce. This approach can reflect the distinct characteristics of individual projects. The proposed model was applied to 23 gas pipeline construction projects under DBB and the lowest bid. This study identified the impacts of the different compositions of major work groups. Bid rates of the main work groups could not only be used to evaluate the damages caused by bid-rigging, but could also be used to determine reliable bid prices and provide a bidding strategy to aid the bidder’s decision-making process in future bids for similar projects.
Similar content being viewed by others
References
ABA (2017) Proving antitrust damages: Legal and economic issues, 3rd edition. American Bar Association, Chicago, IL, USA
Alsaedi M, Assaf S, Hassanain MA, Abdallah A (2019) Factors affecting contractors’ bidding decisions for construction projects in Saudi Arabia. Buildings 9(2):33, DOI: https://doi.org/10.3390/buildings9020033
Ashurst Report (2004) Study on the conditions of claims for damages in case of infringement of EC competition rules: Comparative report. Ashurst, Brussels, Belgium
Boyer M, Kotchoni R (2015) How much do cartel overcharge. Review of Industrial Organization 47:119–153, DOI: https://doi.org/10.1007/s11151-015-9472-1
CEPS, EUR, LUISS (2007) Making antitrust damages actions more effective in the EU: Welfare impact and potential scenarios. Contract DG COMP/2006/A3/012, Centre for European Policy Studies (CEPS), Brussels, Rome, Rotterdam
Chen YQ, Zhang SJ, Liu LS, Hu J (2015) Risk perception and propensity in bid/no-bid decision-making of construction projects. Engineering, Construction and Architectural Management 22(1):2–20, DOI: https://doi.org/10.1108/ECAM-01-2013-0011
Choi JW, Kim HS (2022) A study on the perceptions and current practices in estimating risk cost of contractor’s construction budget–focused on building projects-. Korean Journal of Construction Engineering and Management 23(3):13–25, DOI: https://doi.org/10.6106/KJCEM.2022.23.3.013 (in Korean)
Fayek A, Ghoshal I, AbouRizk S (1999) A survey of bidding practices of Canadian civil engineering construction contractors. Canadian Journal of Civil Engineering 26(1):13–25, DOI: https://doi.org/10.1139/198-038
Howard JH, Kaserman D (1989) Proof of damages in construction industry bid-rigging cases. The Antitrust Bulletin/Summer 34:359–393
Kim KJ, Kim K (2010) Preliminary cost estimation model using case-based reasoning and genetic algorithm. Journal of Computing in Civil Engineering 24(6):499–505, DOI: https://doi.org/10.1061/(ASCE)CP.1943-5487.0000054
Kim BY, Kim YS (2012) The analysis of the major cost-increasing risk factors from the perspective of construction management - Focusing on pre-construction phases. Korean Journal of Construction Engineering and Management 13(2):147–155, DOI: https://doi.org/10.6106/KJCEM.2012.13.2.147 (in Korean)
Kim KJ, Kim K, Kim EW, Nguyen THT (2021) Estimating damages of bid-rigging in design-build contracts based on simulation model. KSCE Journal of Civil Engineering 25:1568–1577, DOI: https://doi.org/10.1007/s12205-021-1571-y
Lee IK, Hahn K (2002) Bid-rigging in auctions for korean public-works contracts and potential damage. Review of Industrial Organization 21:73–88, DOI: https://doi.org/10.1023/A:1016018505021
Nelson JP (1993) Comparative antitrust damages in bid-rigging cases: Some findings from a used vehicle auction. The Antitrust Bulletin 38(2):369–394, DOI: https://doi.org/10.1177/0003603X9303800206
Niekerk AV (2015) Calculating cartel follow-on damages: General considerations and application to South African construction sector. Econex (Pty) Ltd., Stellenbosch, South Africa
Oyeyipo O, Odusami KT, Ojelabi RA, Afolabi AO (2016) Factors affecting contractors’ bidding decisions for construction projects in Nigeria. Journal of Construction in Developing Countries 21(2):21–35, DOI: https://doi.org/10.21315/jcdc2016.21.2.2.
Palisade (2020) @Risk and Decision Tool Suite [Computer software]. https://www.palisade.com/
Shash AA (1993) Factors considered in tendering decisions by top UK contractors. Construction Management and Economics 11(2):111–118, DOI: https://doi.org/10.1080/01446199300000004
Shokri-Ghasabeh M, Chileshe N (2016) Critical factors influencing the bid/no bid decision in the Australian construction industry. Construction Innovation 16(2):127–157, DOI: https://doi.org/10.1108/CI-04-2015-0021
Supreme Court of Korea (2011) Decision of 28 July 2011, 2010Da18850 (in Korean)
Yun WG, Bae BY, Kang TK (2022) Comparison of construction cost applied by RC and PC construction method for apartment house and establishment of OSC economic analysis framework. Korean Journal of Construction Engineering and Management 23(6):30–42, DOI: https://doi.org/10.6106/KJCEM.2022.23.6.030 (in Korean)
Acknowledgments
This research was supported by Basic Science Research Program through the National Research Foundation of Korea (NRF) funded by the Ministry of Science and ICT (No. 2019R1A2C2010794) and this research was supported by the Chung-Ang University Research Grant in 2018 and the Chung-Ang University Research Scholarship Grants in 2023.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Kim, K.J., Kim, D.S., Kim, K. et al. Estimating Hypothetical Competitive Bid Price on Bid-rigged Projects Based on the Weights of Major Work Groups. KSCE J Civ Eng (2024). https://doi.org/10.1007/s12205-024-1891-9
Received:
Accepted:
Published:
DOI: https://doi.org/10.1007/s12205-024-1891-9