Strategic UK CCS Storage Appraisal - Level 2 Cost Estimate - SITE 5: Viking Minimum Viable Development


Description:

This spreadsheet provides the underlying breakdown of the capital cost estimate for the NE England location. Note that minor changes have been made to numbers in the spreadsheet to protect commercially sensitive cost data that was used in calculating the operating cost in D5.1. Hence the total numbers in the spreadsheet may differ slightly from those presented in D5.1.

Creator:

Pale Blue Dot Energy, Axis Well Technology, Costain

Publisher:

ETI

Citation (APA Style 7th Edition):

Pale Blue Dot Energy, Axis Well Technology, Costain (2015). Strategic UK CCS Storage Appraisal - Level 2 Cost Estimate - SITE 5: Viking Minimum Viable Development [Data set]. ETI. https://doi.org/10.5286/UKERC.EDC.000846

Energy Category

Class Name:

Subclass Name:

Category Name:

Field Dates:

01/01/2009 - 31/12/2018

Data Date Range:

01/01/2015 - 31/12/2031

Data type:

Report

Data format:

application/excel

Language:

English

Number of Units:

No unit numbers supplied

Unit Type:

No units supplied

Number of Records:

No records supplied

Parameters:

No parameters supplied

Rights:

Energy Technologies Institute Open Licence for Materials

Rights Overview:

The Energy Technologies Institute is making this document available to use under the Energy Technologies Institute Open Licence for Materials. Please refer to the Energy Technologies Institute website for the terms and conditions of this licence. The Information is licensed "as is" and the Energy Technologies Institute excludes all representations, warranties, obligations and liabilities in relation to the Information to the maximum extent permitted by law. The Energy Technologies Institute is not liable for any errors or omissions in the Information and shall not be liable for any loss, injury or damage of any kind caused by its use. This exclusion of liability includes, but is not limited to, any direct, indirect, special, incidental, consequential, punitive, or exemplary damages in each case such as loss of revenue, data, anticipated profits, and lost business. The Energy Technologies Institute does not guarantee the continued supply of the Information. Notwithstanding any statement to the contrary contained on the face of this document, the Energy Technologies Institute confirms that it has the right to publish this document.

Further information:

N/A

Sector:

Industrial