Published January 28, 2023 | Version v1
Journal article Open

Analysis of the Influence of External Environmental Factors, Material Factors, Project Specifications and Team Capabilities on H3I Project Performance Installation of BTS Devices in Mobile Telecommunications Networks

Description

The purpose of the study was to determine the impact of external environmental elements, material considerations, project specifications, and team capabilities on the project performance of PT Adyawinsa Telecommunications & Electrical. The method of analysis employing regression analysis with SPSS statistical software. Adjusted R Square (R2) is calculated to be 0.772% based on the findings of the regression analysis. 77.2 percent of the variance in the dependent variable firm performance may be explained by internal environmental factors (X1), material factors (X2), project requirements (X3), and team capabilities (X4), whereas 22.8 percent is influenced by variables outside the scope of this study. Calculated F value = 51,655> F table = 2,534 with Sig. F 0.000 < = 0.05, meaning that the internal environmental factors, project specification material factors and team capabilities (X5) simultaneously have an effect on project performance (Y). The results of the t-test indicate that there are 3 independent (free) variables that significantly affect the dependent variable with an error rate of less than 5%. These variables are external environmental factor variables (Sig: 0.015), material factor variables (Sig: 0.000) and project specification variables (Sig: 0.000), while the team capability variable does not significantly affect project performance.

Files

IJISRT23JAN603 (1).pdf

Files (395.2 kB)

Name Size Download all
md5:a8b94dbda4869d3bc9b172769e22cbd9
395.2 kB Preview Download