D4.2 Report on Implementations for METRO HAUL Control for Resource and Service Management
Creators
- Luis Velasco1
- Gabriel Junyent1
- Jaume Comellas1
- Marc Ruiz1
- Lluis Gifre1
- Ramon Casellas2
- Ricardo Martínez2
- Ricard Vilalta2
- Raül Muñoz2
- Michela Svaluto2
- Francisco Javier Moreno,3
- Miquel Garrich3
- Pablo Pavón3
- Jorge E. López de Vergara4
- Mario Ruiz4
- Luis Vaquero4
- José F. Zazo4
- Sergio López-Buedo4
- Alessio Giorgetti5
- Filippo Cugini5
- Annalisa Morea6
- Danish Rafique7
- Antonio D'Errico8
- Abubakar Siddique Muqaddas9
- Oscar Gonzalez de Dios10
- Adrian Farrel11
- 1. Universitat Politecnica de Catalunya (UPC)
- 2. Centre Tecnologic de Telecomunicacions de Catalunya (CTTC)
- 3. UPCT
- 4. Naudit HPCN
- 5. Consorzio Nazionale Interuniversitario Per Le Telecomunicazioni (CNIT)
- 6. NOKIA Italy
- 7. Adva Optical Networking
- 8. Antonio D'Errico
- 9. University of Bristol
- 10. Telefonica Investigacion y Desarrollo
- 11. Old Dog Consulting
Description
This document (D4.2) reports the final architecture of the METRO-HAUL control, orchestration, and management (COM) system from its initial design in D4.1, after successive refinements driven by feedback gathered after implementation and integration activities, and reflecting additional choices and newly added components.
In addition, the document reports the status and assessment of the final implementation of METRO-HAUL functional components, including control plane validation of relevant performance indicators and tests. The description of each functional component in the COM includes the list of subcomponents and their status. The functional tests carried out to validate and integrate the subcomponents are described together with the testbeds used. The definition of the specific key performance indicators (KPIs) in which the component is involved are defined and measured. The interfaces connecting functional components of the COM are defined in terms of functions with regard to requirements in D4.1 and new functions. Details of the implementation of every function are reported.
Files
D4.2 Report on Implementations for METRO HAUL Control for Resource and Service Management.pdf
Files
(4.8 MB)
Name | Size | Download all |
---|---|---|
md5:9fc8f4df0198a387e082efdf269e696a
|
4.8 MB | Preview Download |