Study on Productivity Improvement in Medium Scale Manufacturing Industry by Execution of Lean Tools

Article Preview

Abstract:

In current scenario, all the manufacturing industries are placing constant efforts for their endurance in the current global volatile economy. Manufacturing industries are annoying to implement new and professional techniques in their regular production processes. Some of the recognized tools are applied and their awareness has been growing among the industries, especially in production sector. Last two decades have witnessed an explosion in the area of quality and productivity improvement initiatives in the manufacturing industries by different tools and techniques such as lean manufacturing, total quality management, total productive maintenance, six sigma implementation etc. The objective of this study is to enlighten the importance of lean techniques implementation in a medium scale belt manufacturing industry. This research study helps to exhibit the existing hidden potential in the selected industry as well as a selection of appropriate techniques for productivity improvements. Also, it aims to eradicate wastes and non-value added activities at every stage in order to enhance the overall productivity. From the results after implementation of appropriate lean techniques it was found that, the lead time was reduced about 1256 minutes and the overall production was increased by about 9%.

You might also be interested in these eBooks

Info:

Pages:

193-207

Citation:

Online since:

May 2020

Export:

Price:

* - Corresponding Author

[1] S.S. Kumar and M.P. Kumar, Cycle time reduction of a truck body assembly in an automobile industry by lean principles, Procedia Materials Science, 5 (2014) 1853-1862.

DOI: 10.1016/j.mspro.2014.07.493

Google Scholar

[2] J.D. Morales Mendez and R.S. Rodriguez, Total productive maintenance as a tool for improving productivity: A case study of application in the bottleneck of an auto-parts machining line, International Journal of Advanced Manufacturing Technology, 92 (1-4) (2017) 1013-1026.

DOI: 10.1007/s00170-017-0052-4

Google Scholar

[3] Arunagiri and Gnanavelbabu, Identification of high impact lean production tools in automobile industries using weighted average method, Procedia Engineering, 97 (2014) 2072-2080.

DOI: 10.1016/j.proeng.2014.12.450

Google Scholar

[4] S. Nallusamy and M.A. Adil Ahamed, Implementation of lean tools in an automotive industry for productivity enhancement - A case study, International Journal of Engineering Research in Africa, 29 (2017) 175-185.

DOI: 10.4028/www.scientific.net/jera.29.175

Google Scholar

[5] R. Shah and P.T. Ward, Defining and developing measures of lean production, Journals of Operation Management, 25(4) (2007) 785-804.

Google Scholar

[6] R. Sundar, A.N. Balaji and R.M. Satheesh Kumar, A review on lean manufacturing implementation techniques, Procedia Engineering, 97 (2014) 1875-1885.

DOI: 10.1016/j.proeng.2014.12.341

Google Scholar

[7] Belekoukias et al., The impact of lean methods and tools on the operational performance of manufacturing organisations. Int. Journal of Production Research, 52(18) (2014) 5346-5366.

DOI: 10.1080/00207543.2014.903348

Google Scholar

[8] B.K. Sharma, Manan Shukla and Ganesh Dubey, Implementation of lean manufacturing in foundry industry - An overview, Indian Foundry Journal, 61(6) (2015) 165-172.

Google Scholar

[9] S. Nallusamy and Gautam Majumdar, Enhancement of overall equipment effectiveness using total productive maintenance in a manufacturing industry, International Journal of Performability Engineering, 13(2) (2017) 01-16.

DOI: 10.23940/ijpe.17.02.p7.173188

Google Scholar

[10] S. Gupta and S.K. Jain, A literature review of lean manufacturing, International Journal of Management Science and Engineering Management, 8(4) (2013) 241-249.

Google Scholar

[11] Upadhye et al., Lean manufacturing system for medium size manufacturing enterprises: An Indian case, Int. Journal of Management Science and Engineering Management, 5(5) (2010) 362-375.

DOI: 10.1080/17509653.2010.10671127

Google Scholar

[12] S. Nallusamy and Saravanan, Lean tools execution in a small scale manufacturing industry for productivity improvement-A case study, Indian Journal of Sci. and Technology, 9(35) (2016) 1-7.

DOI: 10.17485/ijst/2016/v9i35/100162

Google Scholar

[13] Nitin Upadhay, Deshmukh and Suresh Garg, Lean manufacturing system for medium size manufacturing enterprises: An Indian case, International Journal of Management Science, 5(5) (2010) 362-375.

DOI: 10.1080/17509653.2010.10671127

Google Scholar

[14] A.R. Rahani and M. Al-Ashraf, Production flow analysis through value stream mapping: A lean manufacturing process case study, Procedia Engineering, 41 (2012) 1727-1734.

DOI: 10.1016/j.proeng.2012.07.375

Google Scholar

[15] S. Vinodh, S.G. Gautham and A. Ramiya, Implementing lean sigma framework in an Indian automotive valves manufacturing organisation: A case study, Production Planning and Control, 22(7) (2017) 708-722.

DOI: 10.1080/09537287.2010.546980

Google Scholar

[16] S. Vinodh, K.R. Arvind and M. Somanaathan, Application of value stream mapping in an Indian camshaft manufacturing organisation, Journal of Manufacturing Technology Management, 21(7) (2017) 888-900.

DOI: 10.1108/17410381011077973

Google Scholar

[17] K. Venkataraman, Ramnath, Kumar and Elanchezhian, Application of value stream mapping for reduction of cycle time in a machining process, Procedia Materials Science, 6 (2014) 1187-1196.

DOI: 10.1016/j.mspro.2014.07.192

Google Scholar

[18] S. Nallusamy, Efficiency enhancement in CNC industry using value stream mapping, work standardization and line balancing, International Journal of Performability Engineering, 12(5) (2016) 413-422.

Google Scholar

[19] V. Ramesh, K.V. Sreenivasa Prasad and T.R. Srinivas, Implementation of a lean model for carrying out value stream mapping in a manufacturing industry, Journal of Industrial and Systems Engineering, 2(3) (2017) 180-196.

Google Scholar

[20] J.M. Rohani and S.M. Zahraee, Production line analysis via value stream mapping: A lean manufacturing process of colour industry, Procedia Manufacturing, 2 (2015) 6-10.

DOI: 10.1016/j.promfg.2015.07.002

Google Scholar

[21] G.H. Sousa Mendes and J.C. Toledo, Organizational characteristics in concurrent engineering: Evidence from Brazilian small and medium enterprises in the medical device industry, Concurrent Engineering, Research and Applications, 23(2) (2015) 135-144.

DOI: 10.1177/1063293x15569512

Google Scholar

[22] Shamuvel V. Pandit, Sunil J. Kadam, Avinash Kharat and Chetan U. Nayakawade, Productivity improvement by application of line balancing, International Journal of Innovative Research in Science, Engineering and Technology, 3(4) (2014) 11495-11502.

Google Scholar

[23] Agrahari, Dangle and K.V. Chandratre, Implementation of 5S methodology in the small scale industry: A case study, International Journal of Scientific and Technology, 4(4) (2015) 180-187.

DOI: 10.51976/ijari.311543

Google Scholar

[24] S. Nallusamy and V. Saravanan, Enhancement of overall output in a small scale industry through VSM, line balancing and work standardization, International Journal of Engineering Research in Africa, 26 (2016) 176-183.

DOI: 10.4028/www.scientific.net/jera.26.176

Google Scholar

[25] Shubhangi and P. Gurway, Implementation of Kaizen as a productivity improvement tool in small manufacturing company, Journal of Information, Knowledge and Research in Mechanical Engineering, 4(1) (2016) 760-771.

Google Scholar

[26] G. Anand and R. Kodali, Development of a framework for implementation of lean manufacturing systems, International Journal of Management Practice, 4(1) (2010) 95-116.

Google Scholar

[27] Anand and Kodali, Design of lean manufacturing systems using VSM with simulation: A case study, Journal of Manufacturing Technology Management, 22(4) (2011) 444-473.

DOI: 10.1108/17410381111126409

Google Scholar

[28] B. Santosh, Dighe and Abhay Kakirde, Lean manufacturing implementation using value stream mapping: A case study of pumps manufacturing company, International Journal of Science and Research, 3(6) (2014) 2492-2498.

Google Scholar

[29] Gunji Venkata Punna Rao et al., Augmentation of production level using different lean approaches in medium scale manufacturing industries, International Journal of Mechanical Engineering and Technology, 8(12) (2017) 360-372.

Google Scholar

[30] Saraswat et al., Reduction of work in process inventory and production lead time in a bearing industry using VSM tool, Int. Journal of Managing Value and Supply Chain, 6(2) (2015) 27-35.

DOI: 10.5121/ijmvsc.2015.6203

Google Scholar