Dampak Covid-19 Terhadap Pelaksanaan Pekerjaan Konstruksi Multi Years

  • Hafnidar A Rani
  • Widya Soviana Program Studi Teknik Sipil, Fakultas Teknik, Universitas Muhammadiyah Aceh
  • Rahimi A. Rahman Faculty of Civil Engineering Technology, Universiti Malaysia Pahang Pekan, Pahang, Malaysia
Keywords: Proyek multi years; pandemi Covid-19; kualitas; biaya; waktu

Abstract

The Covid-19 has impacted all human aspects. One of the impacts is the construction sector for infrastructure construction become an important component supporting national economic development. The problem of the study was whether the quality, cost and time factors of multi-year construction project work implementation is influenced by the Covid-19 pandemic. The study aimed to find out how much Covid-19 pandemic influencing the quality, cost and time of multi-year construction projects implementation. The study methods used are a quantitative approach method by using Guttman scale questionnaire instrument and qualitative approach method by using interviews. The sampling technique used is quota sampling from project implementing elements consisting of project owners, contractors and construction management consultants on construction and revitalization project of Balohan Port. The study case selection because the project was indicated impacted by Covid-19 pandemic. Regression analysis resulted that if there is no change to the quality, cost and time variables, the impact of the Covid-19 pandemic on the multi-year projects implementation was 0.855 units. Based on the R square value, the impact of the Covid-19 pandemic on multi-year projects was influenced by the quality, cost and time variables as 65% ​​while 35% is influenced by other factors. The quality of multi-year projects was affected by disruption of project implementation activities, the cost was affected by additional costs due to health protocols and the delays was affected by waiting time because of due to materials scarcity arrived in the project site. It is concluded that the quality, cost and time variables impact Covid-19 pandemic in which the cost factor become the most affected to the implementation of multi-year projects as 74.50% as mean percentage

Downloads

Download data is not yet available.

References

Agritama, R. P, Huda, M. & Rini, T. S. (2018). Faktor-faktor yang Mempengaruhi Keterlambatan Proyek Konstruksi di Surabaya. Axial: Jurnal Rekayasa dan Manajemen Konstruksi, 6(1), 25-32. https://journal.uwks.ac.id/index.php/axial/article/view/472
Amusan, L. M., Afolabi, A., Ojelabi, R., Omuh, I. & Okagbue, H. I. (2018). Data Exploration on Factors That Influences Construction Cost and Time Performance on Construction Project Sites. Data in Brief, Elsevier, 17. https://www.sciencedirect.com/science/article/pii/S2352340918301513
Åsgård, T. & Jørgensen, L. (2019). Health and Safety in Early Phases of Project Management in Construction. Procedia Computer Science, Elsevier, 164, 343-349. https://www.semanticscholar.org/paper/Health-and-safety-in-early-phases-of-project-in-%C3%85sg%C3%A5rd-J%C3%B8rgensen/9609c4abf25cdd347b3ab7e000915fb3d8e3902c
Belay, A. M. & Torp, O. (2017). Do Longer Projects Have Larger Cost Deviation Than Shorter Construction Projects? Procedia Engineering, Elsevier, 196, 262-269. https://www.sciencedirect.com/science/article/pii/S1877705817330576
Djalante, R., Lassac, J., Setiamarga, D., Sudjatma, A., Indrawan, M., Haryanto, B., Mahfud, C., Sinapoy, M. S., Djalante, S., Rafliana, I., Gunawan, L. A., Surtiari, G. A. K. & Warsilah, H. (2020). Review and Analysis of Current Responses to COVID-19 in Indonesia: Period of January to March 2020, Progress in Disaster Science, Elsevier, 6. https://www.sciencedirect.com/science/article/pii/S2590061720300284
Ervianto, W. (2005). Manajemen Proyek Kontruksi. Andi, Yogyakarta.
Khodeir, L. & Ghandour, A. (2019). Examining The Role of Value Management in Controlling Cost Overrun [Application on Residential Construction Projects in Egypt]. Ain Shams Engineering Journal, 10(3), Elsevier, 471-479. https://www.semanticscholar.org/paper/Examining-the-role-of-value-management-in-cost-on-Khodeir-Ghandour/51e5a6e88c1466d25053a87d5716277a467ac79b
Menteri Pekerjaan Umum dan Perumahan Rakyat Republik Indonesia (2020). Instruksi Menteri Pekerjaan Umum dan Perumahan Rakyat No. 02/IN/M/2020 tentang protokol pencegahan penyebaran Corona Virus Disease 2019 (Covid-19) dalam penyelenggaraan jasa konstruksi. Protokol Covid-19, 1-21. https://sitaba.pu.go.id/covid19/uploads/Inmen_PUPR_No__02_Tahun_2020_Tentang_Pencegahan_Penyeberan.pdf.
PUPR, K. (2020). Kebijakan dan Perubahan di Sektor Jasa Konstruksi di Masa Pandemi. Buletin Konstruksi, 1-32. http://binakonstruksi.pu.go.id/jdownloads/Buletin/Buletin_2020/Buletin_Konstruksi_4_20.pdf.
Rani, H. A. (2021). Fungsionalitas Manajemen Proyek dalam Kesuksesan Proyek Konstruksi. Deepublish, Yogyakarta.
Sajiah, F. S. (2020). Penyebab Keterlambatan Penyelesaian Proyek Kontrak Tahun Jamak (Causes of Multi Years Contract Project Delay). Jurnal Anggaran dan Keuangan Negara Indonesia (AKURASI), 2(2). 145-162. https://anggaran.e-journal.id/akurasi/issue/view/8
Santoso, K. J., Wijaya, K. A., Chandra, H. P. & Ratnawidjaja, S. (2021). Potret Industri Konstruksi di Surabaya dalam Masa Pandemi Covid-19. Jurnal Dimensi Pratama Teknik Sipil, 2(1), 57-64. http://publication.petra.ac.id/index.php/teknik-sipil/article/view/11012
Senouci, A., Ismail, A. & Eldin, N. (2016). Time Delay and Cost Overrun in Qatari Public Construction Projects. Procedia Engineering, Elsevier, 164, 368-375. https://www.sciencedirect.com/science/article/pii/S187770581633973X
Sentosa, B. (2009). Manajemen Proyek: Konsep dan Implementasi. Graha Ilmu, Yogyakarta.
Sufa, M. F. (2012). Identifikasi Kriteria Keberhasilan Proyek. Performa, 11(1), 19-22.
Suharsaputra, U. (2012). Metode Penelitian Kuantitatif, Kualitatif dan Tindakan. Refika Aditama, Bandung.
Tang, S. L, Poon, S. W, Ahmed, S. M, & Wong, F. (2003). Modern Construction Project Management. Hongkong: Hongkong University Press.
WHO. (2020). Critical Preparedness, Readiness and Response Actions for COVID-19: WHO/2019-nCoV/Community_Actions/2020.3,” (March), 1-5. https://www.who.int/publications-detail/critical-preparedness-readiness-and-response-actions-for-covid-19.
Yang, L., Liu, J., Zhang, R., Li, M., Li, Z., Zhou, X., Hu, C., Tian, F., Zhou, F. & Lei, Y. (2020). Epidemiological and Clinical Features of 200 Hospitalized Patients with Corona Virus Disease 2019 Outside Wuhan, China: A Descriptive Study. Journal of Clinical Virology, Elsevier, 129. https://pubmed.ncbi.nlm.nih.gov/32485619/
Zulkarnaini. (2020). Revitalisasi Pelabuhan Sabang Ditargetkan Rampung Pertengahan 2020. https://kompas.id/baca/nusantara/2020/01/24/revitalisasi-pelabuhan-sabang-ditargetkan-rampung-pertengahan-2020/
Published
2022-04-11
How to Cite
Rani, H. A., Soviana, W., & Rahman, R. A. (2022). Dampak Covid-19 Terhadap Pelaksanaan Pekerjaan Konstruksi Multi Years. Siklus : Jurnal Teknik Sipil, 8(1), 11- 23. https://doi.org/10.31849/siklus.v8i1.8627
Section
Articles
Abstract viewed = 454 times
pdf downloaded = 792 times

Most read articles by the same author(s)