Skip to main content

Research on Prediction of Transmission and Transformation Project Cost Index Based on ARIMA and Exponential Smoothing Models

  • Conference paper
  • First Online:
Proceedings of the 22nd International Conference on Industrial Engineering and Engineering Management 2015

Abstract

Reasonable prediction of transmission and transformation line project cost index is of important significance to control the project cost and improve investment efficiency and strengthen the project cost management of power grid enterprises. Selecting the appropriate models and methods to predict the trends of cost index has been a research focused on the power transmission and transformation project cost analysis. In this paper, regarding power transmission and transformation line project cost index from 2008 to 2012 in Zhejiang Province as the research object, estimate the cost index reasonably, and construct cost index analysis and prediction model based on ARIMA and exponential smoothing models, and then, realize the process of modeling and obtain forecast results through SPSS software, which have some references in the application of prediction method.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 259.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Hardcover Book
USD 329.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Dong-xiao Niu .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2016 Atlantis Press and the author(s)

About this paper

Cite this paper

Niu, Dx., Hua, Fy. (2016). Research on Prediction of Transmission and Transformation Project Cost Index Based on ARIMA and Exponential Smoothing Models. In: Qi, E., Shen, J., Dou, R. (eds) Proceedings of the 22nd International Conference on Industrial Engineering and Engineering Management 2015. Atlantis Press, Paris. https://doi.org/10.2991/978-94-6239-177-2_79

Download citation

  • DOI: https://doi.org/10.2991/978-94-6239-177-2_79

  • Published:

  • Publisher Name: Atlantis Press, Paris

  • Print ISBN: 978-94-6239-176-5

  • Online ISBN: 978-94-6239-177-2

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics