鉄と鋼
Online ISSN : 1883-2954
Print ISSN : 0021-1575
ISSN-L : 0021-1575
本邦銑鉄製造技術の進歩
和田 亀吉
著者情報
ジャーナル フリー

1955 年 41 巻 7 号 p. 714-722

詳細
抄録

As nothing but domestic iron ore of high sulphur and of poor quality was used, pig iron making operation in Japan right after the ternination of the War could not reach the high efficiency of production, despite of the all-out efforts they were making. As the result of rationalization of equipments and strictly-enforced quality control launched in around 1950, however, the 1000 ton blast furnace, the actual production of which had been 800 tons before the War, was able to tap out 1200 tons per day at the highest in the monthly average in 1954. The average coke ratio in Japan came down below 700 kg. per ton of pig iron, and that of Yawata Works since Sept.1954 has kept up the bright record of 680 kg, surpassing the world level.
The present author explained that this advancement was brougnt about chiefly by the improvement of facilities and the quality control of coke as well as by the increased ratio of sinter in the burden of B. F. A mention is also made of the technical progress achieved in Yawata Works.

著者関連情報
© 一般社団法人 日本鉄鋼協会
前の記事 次の記事
feedback
Top