Project W-320, 241-C-106 sluicing electrical calculations, Volume 2
This supporting document has been prepared to make the FDNW calculations for Project W-320, readily retrievable. These calculations are required: To determine the power requirements needed to power electrical heat tracing segments contained within three manufactured insulated tubing assemblies; To verify thermal adequacy of tubing assembly selection by others; To size the heat tracing feeder and branch circuit conductors and conduits; To size protective circuit breaker and fuses; and To accomplish thermal design for two electrical heat tracing segments: One at C-106 tank riser 7 (CCTV) and one at the exhaust hatchway (condensate drain). Contents include: C-Farm electrical heat tracing; Cable ampacity, lighting, conduit fill and voltage drop; and Control circuit sizing and voltage drop analysis for the seismic shutdown system.
- Research Organization:
- Fluor Daniel Hanford, Inc., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 353333
- Report Number(s):
- HNF-2488; ON: DE99050909; BR: EW3130010; TRN: AHC29923%%165
- Resource Relation:
- Other Information: PBD: 7 Aug 1998
- Country of Publication:
- United States
- Language:
- English
Similar Records
Project W-320, 241-C-106 sluicing: Construction specification W-320-C6
Project W-320, 241-C-106 sluicing: Construction specification W-320-C2