Title |
FLUKA-MARS15 Simulations To Optimize the Fermilab PIP-II Movable Beam Absorber |
Authors |
- L. Lari, F.G. Garcia, Y. He, I. Kourbanis, N.V. Mokhov, E. Pozdeyev, I.L. Rakhno
Fermilab, Batavia, Illinois, USA
- F. Cerutti, L.S. Esposito, L. Lari
CERN, Meyrin, Switzerland
|
Abstract |
PIP-II is the Fermilab’s flagship project to provide powerful, high-intensity proton beams to the laboratory’s experiments. The heart of the PIP-II project is an H⁻ 800 MeV superconducting linear accelerator. In order to commission the beam and operate safely the linac, several constraints were evaluated. The design of a movable 5 kW beam absorber was finalized to allow staged beam commissioning in different linac locations. Prompt and residual radiation levels were calculated, and radiation shields were optimized to keep those values within the acceptable levels in the areas surrounding beam absorber. Monte Carlo calculations with FLUKA and MARS15 codes are presented in the paper to support these studies.
|
Paper |
download MOPTS110.PDF [0.896 MB / 4 pages] |
Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
Conference |
IPAC2019 |
Series |
International Particle Accelerator Conference (10th) |
Location |
Melbourne, Australia |
Date |
19-24 May 2019 |
Publisher |
JACoW Publishing, Geneva, Switzerland |
Editorial Board |
Mark Boland (UoM, Saskatoon, SK, Canada); Hitoshi Tanaka (KEK, Tsukuba, Japan); David Button (ANSTO, Kirrawee, NSW, Australia); Rohan Dowd (ANSTO, Kirrawee, NSW, Australia); Volker RW Schaa (GSI, Darmstadt, Germany); Eugene Tan (ANSTO, Kirrawee, NSW, Australia) |
Online ISBN |
978-3-95450-208-0 |
Received |
14 May 2019 |
Accepted |
20 May 2019 |
Issue Date |
21 June 2019 |
DOI |
doi:10.18429/JACoW-IPAC2019-MOPTS110 |
Pages |
1136-1139 |
Copyright |
Published by JACoW Publishing under the terms of the Creative Commons Attribution 3.0 International license. Any further distribution of this work must maintain attribution to the author(s), the published article's title, publisher, and DOI. |
|