Reliability Analysis of a Three-unit Pumping System

Reliability Analysis of a Three-unit Pumping System

  IJETT-book-cover           
  
© 2022 by IJETT Journal
Volume-70 Issue-6
Year of Publication : 2022
Authors : Syed Mohd Rizwan, Habib Al Nabhani, Yaqoob Al Rahbi, Senguttuvan Alagiriswamy
DOI : 10.14445/22315381/IJETT-V70I6P203

How to Cite?

Syed Mohd Rizwan, Habib Al Nabhani, Yaqoob Al Rahbi, Senguttuvan Alagiriswamy, "Reliability Analysis of a Three-unit Pumping System," International Journal of Engineering Trends and Technology, vol. 70, no. 6, pp. 24-31, 2022. Crossref, https://doi.org/10.14445/22315381/IJETT-V70I6P203

Abstract
Three-unit pumping system of a water pumping station is analyzed. The pumping station receives water from the desalination plant, which is then supplied to the consumers through three pumps. The pumps need to be functional to supply potable water continuously without interrupting the water network. To ensure the optimized performance of the pumps, maintenance practices need to be evaluated based on the performance of the pumps, and hence is a potential case study from a reliability outcomes perspective. Five years of real maintenance data of the three pumps are collected from the pumping station, and various failures and restoration rates are estimated from the data. The objective is to obtain the reliability indices of the system, such as mean time to system failure for two pumps, availability, and the expected busy period of the maintenance team, for gauging the operational capabilities of the pumps. Semi-Markov and regenerative processes have been used for this analysis.

Keywords
Reliability, Pumps, Failures, Repairs, Semi–Markov processes, Regenerative processes.

Reference
[1] M.A.W. Mahmoud, Reliability Study of a Two-Unit Cold Standby Redundant System with Two Types of Failure and Preventive Maintenance, Microelectron, Reliab. 29 (1989) 1061-1068.
[2] M.N. Gopalan, and N.N. Muralidhar, Cost Analysis of a One-Unit Repairable System Subject to Online Preventive Maintenance or/and Repair, Microelectron, Reliab. 31 (1991) 223-228.
[3] G S. Mokaddis, S. W. Labib, and A.M. Ahmed, Analysis of a Two-Unit Warm Standby System Subject to Degradation, Microelectron, Reliab. 37(4) (1997) 641-648.
[4] X. Li, and J. Chen, Aging Properties of the Residual Life Length of K-out-of-N System with Independent but Non-Identical Components, Applied Stochastic Models in Business and Industry. 20 (2004) 143-153.
[5] Rizwan S. M, Reliability Modeling Strategy of an Industrial System, in Proceedings of IEEE Conference Publications of Computer Society, First International Conference on Availability, Reliability and Security ARES’06, Vienna University of Technology, Austria. 20-21(2006) 625-630. Doi: 10.1109/ARES.
[6] Zuhair, Al Hemyari and Rizwan S. M, Reliability Analysis of a Two Unit System, in Proceedings of IEEE Conference Publications, IEEE International Conference on Industrial Engineering and Engineering Management, Singapore. 2-5 (2007) 1265-1268. Doi:10.1109/1EEM.2007.
[7] Parashar B, Taneja G, Reliability and Profit Evaluation of a PLC Hot Standby System Based on Master Slave Concept and Two Types of Repair Facilities, IEEE Trans Reliab. 56(3) (2007) 534–53.
[8] Gupta S, Tewari P. C, Simulation Modeling and Analysis of a Complex System of a Thermal Power Plant, J Ind Eng Manag. 2(2) (2009) 387–406
[9] Mathew A, Rizwan S. M, Majumder M and Ramachandran K, MTSF and Availability of a Two-Unit CC plant, In: 3rd International Conference on Modeling, Simulation, and Applied Optimization, Sharjah, UAE. (2009) 1-5.
[10] Mathew A, Rizwan S. M, Majumder M and Ramachandran K, Reliability Modelling and Analysis of a Two-Unit Continuous Casting Plant, Journal of the Franklin Institute. 348(7) (2011) 1488-1505.
[11] Mathew A, Rizwan S. M, Majumder M, Ramachandran K and Taneja G, Reliability Analysis of an Identical Two-Unit Parallel CC Plant System Operative with Full Installed Capacity, International Journal of Performability Engineering. 7(2) (2011) 179-185.
[12] Rizwan S. M, Padmavathi N and Taneja G, Cost Benefit Analysis of a Desalination Unit, International Conference on Mathematics and Soft Computing, Panipat, Haryana, India. 4-5 (2010) 139-142.
[13] Sharma U, Taneja G, Analysis of a Two Standby Oil Delivering System with a Provision of Switching over to Another System at Need to Increase the Availability, J Math Stat. 7(1) (2011) 57–60
[14] Sharma U and Kaur J, Availability Analysis of a Standby System with Three Types of Failure Categories, IOSR Journal of Mathematics. 10(2) (2014) 23–28.
[15] Sharma U and Kaur J, Comparative Study of Standby Compressor Systems with and without Provision of Priority to Failed Compressor Unit, International Journal of Applied Mathematics & Statistical Sciences. 3(6) (2014) 1-8.
[16] Kumar R. K, Sharma A, Tewari P. C, Performance Modeling of Furnace Draft Air Cycle in a Thermal Power Plant, Int J Eng Sci Technol. 3(7) (2011) 6792–6798
[17] Bhatia PK, Naithani A, Parashar B, Taneja G, Reliability Modelling of a 3-Unit Induced Draft Fan Cold Standby System Working at Full/Reduced Capacity, Int J Math Arch. 3(10) (2012) 3737–3744
[18] Parashar B, Naithani A, Bhatia P.K, Analysis of a 3-Unit Induced Draft Fan System with One Warm Standby, Int J SciTechnol. 4(11) (2012) 4620–4628.
[19] M. Ram and S. B. Singh, Cost Benefit Analysis of a System Under Head of-Line Repair Approach Using Gumbel Hougaard Family Copula, Journal of Reliability and Statistical Studies. 5(2) (2012) 105-118
[20] Bhardwaj R. K and Singh R, Semi Markov Approach for Asymptotic Performance Analysis of a Standby System with Server Failure, Int J Comp. Appl. 98(3) (2014) 9-14.
[21] Gupta S and S. K. Gupta, Stochastic Analysis of a Reliability Model of One-Unit System with Post Inspection, Post Repair, Preventive Maintenance and Replacement, International Journal of Mechanical Engineering and Robotics Research. 2(2) (2013) 178-188.
[22] Niwas. R, M. S. Kadyan and Kumar J, MTSF and Profit Analysis of a Single Unit System with Inspection for Feasibility of Repair beyond Warranty, International Journal of System Assurance Engineering and Management. 7(1) (2014) 198-204.
[23] Rizwan S. M, Padmavathi N, Anita Pal and Taneja G, Reliability Analysis of a Seven Unit Desalination Plant with Shutdown During Winter Season and Repair / Maintenance on FCFS Basis, International Journal of Performability Engineering. 9(5) (2013) 523-528.
[24] Rizwan S. M, Thanikal J and Torrijos M, A General Model for Reliability Analysis of a Domestic Wastewater Treatment Plant, International Journal of Condition Monitoring and Diagnostic Engineering Management. 17(3) (2014) 3-6.
[25] Rizwan S. M, Thanikal J, Padmavathi N & Yazdi H, Reliability & Availability Analysis of an Anaerobic Batch Reactor Treating Fruit and Vegetable Waste, International Journal of Applied Engineering Research. 10(24) (2015) 44075-44079.
[26] Padmavathi N, Rizwan S. M, Senguttuvan A, Comparative Analysis between the Reliability Models Portraying Two Operating Conditions of a Desalination Plant, International Journal of Core Engineering & Management. 1(12) (2015) 1-10.
[27] Al Rahbi Y, Rizwan S. M, Alkali B, Cowell A and Taneja G, Reliability Analysis of a Sub-System in Aluminum Industry Plant, In: 6th International Conference on Reliability, Infocom Technologies and Optimization Trends and Future Directions, Noida, UP, India. (2017) 199-203.
[28] Al Rahbi Y, Rizwan S. M, Alkali B, Cowell A and Taneja G, Reliability Analysis of Rodding Anode Plant in Aluminum Industry, International Journal of Applied Engineering Research. 12(16) (2017) 5616-5623.
[29] Al Rahbi Y, Rizwan S. M, Babakalli Alkali, Andrew Cowel and Gulshan Taneja, Reliability Analysis of a Sub-system in Aluminum Plant, in Proc. of 6th International Conference on Reliability, Infocom Technologies and Optimization, IEEE Conference, Amity Institute of Information Technology, Amity University, Noida, UP, India. 20-22 (2017) 203-207.
[30] Al Rahbi Y, Rizwan S. M, Alkali B, Cowell A and Taneja G, Maintenance Analysis of a Butt Thimble Removal Station in Aluminum Plant, International Journal of Mechanical Engineering and Technology. 9(4) (2018) 695-703.
[31] Al Rahbi Y, Rizwan S. M, Alkali B, Cowell A and Taneja G, Reliability Analysis of Rodding Anode Plant in an Aluminum Industry with Multiple Repairmen, Advances and Applications in Statistics. 53(5) (2018) 569-597.
[32] Al Rahbi Y, Rizwan S. M, Alkali B, Cowell A and Taneja G, Reliability Analysis of a Rodding Anode Plant in Aluminum Industry with Multiple Units’ Failure and Single Repairman, International Journal of System Assurance Engineering and Management. 10(1) (2019) 97-109.
[33] Al Rahbi Y, Rizwan S. M, Alkali B, Cowell A and Taneja G, Reliability Analysis of Multiple Units with Multiple Repairmen of Rodding Anode Plant in Aluminum Industry, Advances and Applications in Statistics. 54(1) (2019) 151-178.
[34] Al Rahbi Y, Rizwan S. M, A Comparative Analysis between the Models of a Single Component with Single Repairman & Multiple Repairmen of an Aluminum Industry, International Conference on Computational Performance Evaluation, Department of Biomedical Engineering, North-Eastern Hill University, Shillong, Meghalaya, India, IEEE Proceedings. 2-4 (2020) 132-135.
[35] M.S. Barak, Neeraj and S.K. Barak, Profit Analysis of a Two-Unit Cold Standby System Model Operating Under Different Weather Conditions Life Cycle Reliab Saf Eng. 7 (2018) 173–183. https://doi.org/10.1007/s41872-018-0048-6.
[36] M.S. Barak, D. Yadav, and S.K. Barak, Stochastic Analysis of Two-Unit Redundant System with Priority to Inspection Over Repair, Life Cycle Reliab Saf Eng. 7 (2018) 71–79. https://doi.org/10.1007/s41872-018-0041-0.
[37] J. Wang, X. Nan and N. Yang, Reliability Analysis of a Two Dissimilar-Unit Warm Standby Repairable System with Priority in Use, Communications in Statistics-Theory and Methods. (2019) 1-23.
[38] I. Yusuf, B.Yusuf and K. Suleiman, Reliability Assessment of a Repairable System Under Online And Offline Preventive Maintenance Life Cycle Reliability and Safety Engineering. (2019) 1-16.
[39] D. Goyal, A. Kumar, M. Saini, H. Joshi, Reliability, Maintainability and Sensitivity Analysis of Physical Processing Unit of Sewage Treatment Plant, SN Appl. Sci. 1 (2019) 1507. https://doi.org/10.1007/s42452-019-1544-7
[40] N. Gupta, M. Saini, and A. Kumar, Operational Availability Analysis of Generators in Steam Turbine Power Plants, SN Appl. Sci. 2 (2020) 779. https://doi.org/10.1007/s42452-020-2520-y.
[41] M. Saini, A. Kumar, Stochastic Modeling of a Single-Unit System Operating Under Different Environmental Conditions Subject to Inspection and Degradation, Proceedings of the National Academy of Sciences, India Section A: Physical Sciences. 90(2) (2020) 319- 326.
[42] O. Dahiya, A. Kumar, and M. Saini, Modeling and Analysis of Concrete Mixture Plant Subject to Coverage Factor and Profust Reliability Approach, Life Cycle Reliab Saf Eng. 9 (2020) 273–281. https://doi.org/10.1007/s41872-019-00104-0.
[43] Singh, N., D. Singh, and A. K. Saini, Cost-Benefit Analysis of Two Non-Identical Units’ Cold Standby System Subject to Heavy Rain with Partially Operative After Repair, Global Journal of Pure and Applied Mathematics. 13 (2017) 137-147
[44] Taj S, Rizwan S. M, Alkali B, Harrison D and Taneja G, Probabilistic Modelling and Analysis of a Cable Plant Sub-System with Priority to Repair Over Preventive Maintenance, i-manager’s Journal on Mathematics. 6(3) (2017) 12-21.
[45] Taj S, Rizwan S. M, Alkali B, Harrison D and Taneja G, Reliability Analysis of a Single Machine Sub-System of a Cable Plant with Six Maintenance Categories, International Journal of Applied Engineering Research. 1(8) (2017) 1752-1757.
[46] Taj S, Rizwan S. M, Alkali B, Harrison D and Taneja G, Reliability Modeling and Analysis of a Single Machine Sub-System of a Cable Plant, In proceedings of 7th International Conference on Modeling, Simulation, and Applied Optimization, Sharjah, UAE: IEEE. (2017) 1-4.
[47] Taj S, Rizwan S. M, Alkali B, Harrison D and Taneja G, Performance Analysis of a Rod Breakdown System, International Journal of Engineering and Technology. 7(3.4) (2018) 243-248.
[48] Taj S, Rizwan S. M, Alkali B, Harrison D and Taneja G, Performance and Cost Benefit Analysis of a Cable Plant with Storage of Surplus Produce, International Journal of Mechanical Engineering and Technology. 9(8) (2018) 814-826.
[49] Taj S, Rizwan S. M, Alkali B, Harrison D and Taneja G, Profit Analysis of a Cable Manufacturing Plant Portraying the Winter Operating Strategy, International Journal of Mechanical Engineering and Technology. 9(11) (2018) 370-381.
[50] Taj S, Rizwan S. M, Alkali B, Harrison D and Taneja G, Reliability Analysis of a 3-Unit Sub-System of a Cable Plant, Advances and Applications in Statistics. 52(6) (2018) 413-429.
[51] Taj S, Rizwan S. M and Taneja G, Reliability Analysis of a Wire Drawing System with Mandatory Rest Period, International Journal of Mechanical Engineering and Technology. 9(4) (2018) 1–10.
[52] Taj S, Rizwan S. M, Alkali B, Harrison D and Taneja G, Three Reliability Models of a Building Cable Manufacturing Plant: A comparative Analysis, International Journal of System Assurance Engineering and Management. 11 (2020) 239–246.
[53] Kadyan S, Malik S.C and Gitanjali, Stochastic Analysis of a Three-Unit Non-Identical Repairable System with Priority to Main Unit for Operations and Repair, International Journal of Reliability and Safety. 14(2/3) (2021) 182-198.