Skip to main content
Advertisement
Browse Subject Areas
?

Click through the PLOS taxonomy to find articles in your field.

For more information about PLOS Subject Areas, click here.

< Back to Article

Pursuit Eye-Movements in Curve Driving Differentiate between Future Path and Tangent Point Models

Figure 2

The motorway on-ramp used in the study (Kehä III - Lahdenväylä, N 60.274643; E25.086422).

Inset: the entry (dotted line) and cornering (solid line) phases of the curve, based on GPS data from an individual run. For explanation of sequencing the curve see main text. The cornering phase is 187 m in length. Image source: National Land Survey of Finland open Topographic Database. license version 1.0 -1 May 2012.

Figure 2

doi: https://doi.org/10.1371/journal.pone.0068326.g002