Knowledge Network Node

TRIAL ASSEMBLY TECHNOLOGY FOR 3D CURVE OPENING STEEL BOX GIRDERChinese Full Text

Gao Junjuan;China Railway Shanhaiguan Bridge Group Co.Ltd;

Abstract: With the increase of design difficulty and the development of computer technology,the designers both at home and abroad always pursuit the landscape effect based on the function of bridge,so that the bridge alignment and cross section become more and more complex,which leads to more difficulties and challenges to manufacturer of the steel bridge.The bridge of south approach ramp 5over River Sava in the City of Belgrade is one kind of landscape bridge.The section of steel box girder is trough shaped.The control method of bridge alignment and geometrical tolerance during trial assembling for 3Dcurve opening steel box girder makes the bridge set up and install successfully.
  • DOI:

    10.13206/j.gjg201406012

  • Series:

  • Subject:

  • Classification Code:

    U445.58

  • Mobile Reading
    Read on your phone instantly
    Step 1

    Scan QR Codes

    "Mobile CNKI-CNKI Express" App

    Step 2

    Open“CNKI Express”

    and click the scan icon in the upper left corner of the homepage.

    Step 3

    Scan QR Codes

    Read this article on your phone.

  • HTML
  • CAJ Download
  • PDF Download

Download the mobile appuse the app to scan this coderead the article.

Tips: Please download CAJViewer to view CAJ format full text.

Download: 66 Page: 47-49 Pagecount: 3 Size: 127K

Related Literature
  • Similar Article
  • Reader Recommendation
  • Associated Author