Knowledge Network Node

Buffer sizing and critical chain project managementChinese Full Text

CHU Chun-chao(Transportation Development Research Center,China Academy of Transportation Science,Beijing 100029,China)

Abstract: An improved buffer sizing method was proposed to deal with various uncertain problems in project management.Effects of project resource intensity,network structure complexity and managers’ preference to risks on buffers were considered and integrated in this method,which ensured buffers sizing even more appropriate regardless of activities scale along chains.Moreover,buffer inherent significance was studied in depth,regarding practical circumstance of project and human subjective behavior,which made the proposed method more realistic and flexible.Finally,a case study was carried out to demonstrate application of the proposed method.Comparison of the proposed method with Cut and Paste(C&P) and Root Square Error(RSE) methods were performed.And Monte Carlo simulation was conducted to validate effectiveness and practicability of the proposed method.
  • DOI:

    10.13196/j.cims.2008.05.199.chuchch.006

  • Series:

  • Subject:

  • Classification Code:

    TU712

  • Mobile Reading
    Read on your phone instantly
    Step 1

    Scan QR Codes

    "Mobile CNKI-CNKI Express" App

    Step 2

    Open“CNKI Express”

    and click the scan icon in the upper left corner of the homepage.

    Step 3

    Scan QR Codes

    Read this article on your phone.

  • HTML
  • CAJ Download
  • PDF Download

Download the mobile appuse the app to scan this coderead the article.

Tips: Please download CAJViewer to view CAJ format full text.

Download: 2360 Page: 1029-1035 Pagecount: 7 Size: 579K

Related Literature
  • Similar Article
  • Reader Recommendation
  • Associated Author