Design of a high power production target for the beam dump facility at CERN

E. Lopez Sola, M. Calviani, P. Avigni, M. Battistin, J. Busom Descarrega, J. Canhoto Espadanal, M. A. Fraser, S. Gilardoni, B. Goddard, D. Grenier, R. Jacobsson, K. Kershaw, M. Lamont, A. Perillo-Marcone, M. Pandey, B. Riffaud, S. Sgobba, V. Vlachoudis, and L. Zuccalli
Phys. Rev. Accel. Beams 22, 113001 – Published 15 November 2019

Abstract

The beam dump facility (BDF) project is a proposed general-purpose facility at CERN, dedicated to beam dump and fixed target experiments. In its initial phase, the facility is foreseen to be exploited by the Search for Hidden Particles Experiment. Physics requirements call for a pulsed 400GeV/c proton beam as well as the highest possible number of protons on target each year of operation (4.0×1019/year), in order to search for feebly interacting particles. The target/dump assembly lies at the heart of the facility, with the aim of safely absorbing the full high intensity Super Proton Synchrotron beam, while maximizing the production of charmed and beauty mesons. High-Z materials are required for the target/dump, in order to have the shortest possible absorber and reduce muon background for the downstream experiment. The design of the production target is one of the most challenging aspects of the facility design, due to the high energy and power density deposition that are reached during operation, and the resulting thermomechanical loads. The nature of the beam pulse induces very high temperature excursions between pulses (up to 100°C), leading to considerable thermally induced stresses and long-term fatigue considerations. The high average power deposited on target (305 kW) creates a challenge for heat removal. During the BDF facility comprehensive design study, launched by CERN in 2016, extensive studies have been carried out in order to define and assess the target assembly design. These studies are described in the present contribution, which details the proposed design of the BDF production target, as well as the material selection process and the optimization of the target configuration and beam dilution. One of the specific challenges and novelty of this work is the need to consider new target materials, such as a molybdenum alloy as core absorbing material and Ta2.5W as cladding. Thermostructural and fluid dynamics calculations have been performed to evaluate the reliability of the target and its cooling system under beam operation. In the framework of the target comprehensive design, a preliminary mechanical design of the full target assembly has also been carried out, assessing the feasibility of the whole target system.

  • Figure
  • Figure
  • Figure
  • Figure
  • Figure
  • Figure
  • Figure
11 More
  • Received 8 April 2019

DOI:https://doi.org/10.1103/PhysRevAccelBeams.22.113001

Published by the American Physical Society under the terms of the Creative Commons Attribution 4.0 International license. Further distribution of this work must maintain attribution to the author(s) and the published article’s title, journal citation, and DOI.

Published by the American Physical Society

Physics Subject Headings (PhySH)

  1. Physical Systems
Accelerators & Beams

Authors & Affiliations

Article Text

Click to Expand

References

Click to Expand
Issue

Vol. 22, Iss. 11 — November 2019

Reuse & Permissions
Author publication services for translation and copyediting assistance advertisement

Authorization Required


×
×

Images

×

Sign up to receive regular email alerts from Physical Review Accelerators and Beams

Reuse & Permissions

It is not necessary to obtain permission to reuse this article or its components as it is available under the terms of the Creative Commons Attribution 4.0 International license. This license permits unrestricted use, distribution, and reproduction in any medium, provided attribution to the author(s) and the published article's title, journal citation, and DOI are maintained. Please note that some figures may have been included with permission from other third parties. It is your responsibility to obtain the proper permission from the rights holder directly for these figures.

×

Log In

Cancel
×

Search


Article Lookup

Paste a citation or DOI

Enter a citation
×