|
For Full-Text PDF, please login, if you are a member of IEICE,
or go to Pay Per View on menu list, if you are a nonmember of IEICE.
|
An Optimization Method for Investment and Maintenance Planning of Power Plants under Uncertain Environments
Keiichi HANDA Shigeru MATSUMOTO Masashi NAKAMOTO Naoshi UCHIHIRA
Publication
IEICE TRANSACTIONS on Fundamentals of Electronics, Communications and Computer Sciences
Vol.E88-A
No.6
pp.1481-1486 Publication Date: 2005/06/01 Online ISSN:
DOI: 10.1093/ietfec/e88-a.6.1481 Print ISSN: 0916-8508 Type of Manuscript: Special Section PAPER (Special Section on Papers Selected from 2004 International Technical Conference on Circuits/Systems, Computers and Communications (ITC-CSCC 2004)) Category: Keyword: investment, maintenance, power plant, decision tree,
Full Text: PDF(264.6KB)>>
Summary:
Investment planning for power plants involves making a long-term plan covering various facility investments, such as the construction of a new power plant or the replacement of an old plant with a new one, under uncertain environments. In this paper, we propose an optimization method for such a planning problem. Our method is based on decision tree analysis, in which uncertain environments are described as scenarios. The maintenance of existing plants is also taken into account by introducing the option of large-scale repair in addition to replacement. In order to avoid combinatorial explosion of failure event scenarios of plants, we introduce the concept of failure risk cost which contributes to simplification of the decision tree and reduction of the calculation time.
|
open access publishing via
|
|
|
|
|
|
|
|