Paper The following article is Open access

Substructure reinforcement study of Cisomang bridge at Purwakarta-Bandung-Cileunyi toll road, West Java Province, Indonesia

, , and

Published under licence by IOP Publishing Ltd
, , Citation H Hendry et al 2020 IOP Conf. Ser.: Mater. Sci. Eng. 732 012027 DOI 10.1088/1757-899X/732/1/012027

1757-899X/732/1/012027

Abstract

At the end of 2016, significant displacement occurred at P2 pier of Cisomang Bridge at Purwakarta-Bandung-Cileunyi toll road KM 100+700, West Java. The shift of pier is caused by the movement of soil under the substructure that has been indicated since 2012. P2 pier is constructed over clay shale. Clay shale has characteristics when in dry condition, the soil has high shear strength, but when the soil absorbs water or expose in open air, the soil loses its strength. P2 pier displacement results in extreme structural damage, so immediate handling is needed to stop the shifting of the pier. Analysis and reinforcement study are carried out using finite element method. Based on analysis, it is discovered that the existing slope stability safety factor of P2 pier is 1.09, indicating that the soil movement can occur if the clay shale is disrupted. Reinforcement is designed to mitigate the shift of the P2 pier by adding 38 pile foundations to the existing foundation configuration. Each pile has diameter of 1.2 meter with a depth of ±30 meter across the existing slip circle. Reinforcement increases the slope stability safety factor to 1.25, indicating that the P2 pier after reinforcing is in safe condition.

Export citation and abstract BibTeX RIS

Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.

Please wait… references are loading.
10.1088/1757-899X/732/1/012027