In a manufacturing company, the machine is one of the most important elements in their production process because machine failure can stop the production process. Therefore, the initial step to minimizing losses caused by machine failure can be done by evaluating the machine condition. Evaluation of machine performance is carried out by measuring the effectiveness of the machine with the Overall Equipment Effectiveness (OEE) method. Based on the calculation result, the OEE value of the machine is 68.63% and this value still under the Japanese Institute of Plant Maintenance standard. Six big losses analysis is performed to determine the biggest loss that affects the effectiveness of the machine. The result of six big losses calculation shows that the most influential factor for the low OEE value of the machine is Reduced Speed Loss (39.12%). Causal analysis with a fishbone diagram is done to find out the causes of the highly reduced speed loss. To calculate the equipment cost loss use the Overall Equipment Cost Loss (OECL) methods. The total of the overall equipment cost loss is IDR 849, 839, 947.53.

Export citation and abstract BibTeX RIS

Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.

Please wait… references are loading.