Simulation evaluation of capacitor bank impact on increasing supply current for alumunium production

, , and

Published under licence by IOP Publishing Ltd
, , Citation S Hasan et al 2018 J. Phys.: Conf. Ser. 978 012062 DOI 10.1088/1742-6596/978/1/012062

1742-6596/978/1/012062

Abstract

DC current supply to power the electrolysis process in producing aluminium at PT Indonesia Asahan Aluminium (Persero) is about 193 kA. At this condition, the load voltage regulator (LVR) transformer generates 0.89 lagging power factor. By adding the capacitor bank to reduce the harmonic distortion, it is expected that the supply current will increase. This paper evaluates capacitor bank installation impact on the system by using ETAP 12.0 simulation. It has been obtained that by installing 90 MVAR capacitor bank in the secondary part of LVR, the power factor is corrected about 8% and DC current increases about 13.5%.

Export citation and abstract BibTeX RIS

Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.

Please wait… references are loading.
10.1088/1742-6596/978/1/012062