Brought to you by:
Paper The following article is Open access

How Fast is Fast Enough? Industry Perspectives on the Use of Large-eddy Simulation in Wind Energy

, and

Published under licence by IOP Publishing Ltd
, , Citation Henrik Asmuth et al 2023 J. Phys.: Conf. Ser. 2505 012001 DOI 10.1088/1742-6596/2505/1/012001

1742-6596/2505/1/012001

Abstract

The use of graphics processing units (GPUs) has facilitated unprecedented performance gains for computational fluids dynamics in recent years. In many industries this has enabled the integration of large-eddy simulation (LES) in the engineering practice. Flow modelling in the wind industry though still primarily relies on models with significantly lower fidelity. This paper seeks to investigate the reasons why wind energy applications of LES are still an exception in the industrial practice. On that account, we present a survey among industry experts on the matter. The survey shows that the large runtimes and computational costs of LES are still seen as a main obstacle. However, other reasons such as a lack of expertise and user experience, the need for more validation, and lacking trust in the potential benefits of LES reveal that computational efficiency is not the only concern. Lastly, we present an exemplary simulation of a generic offshore wind farm using a GPU-resident Lattice Boltzmann LES framework. The example shows that the runtime requirements stated by a large part of the respondents can already now be fulfilled with reasonable hardware effort.

Export citation and abstract BibTeX RIS

Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.

Please wait… references are loading.