The following article is Open access

Test and Commissioning of 82.6 GHz ECRH system on SST-1

, , , , , , , , , , , , , , , , , , , , , , , , , , , , and

Published under licence by IOP Publishing Ltd
, , Citation D Bora et al 2005 J. Phys.: Conf. Ser. 25 96 DOI 10.1088/1742-6596/25/1/013

1742-6596/25/1/96

Abstract

Electron Cyclotron Resonance Heating (ECRH) system will play an important role in plasma formation, heating and current drive in the Superconducting Steady state Tokamak (SST-1). Commissioning activity of the machine has been initiated. Many of the sub-systems have been prepared for the first plasma discharge. A radial and a top port have been allotted for low field side (LFS) and high field side (HFS) launch of O and X- modes in the plasma.

The system is based on a gyrotron source operating at a frequency of 82.6±0.1GHz (GLGD-82.6/0.2) and capable of delivering 0.2 MW / 1000s with 17% duty cycle. The transmission line consisting of ∼15 meters length 63.5mm corrugated wave guide, DC break, wave guide switch, mitre bend, polariser, bellows that terminates with a vacuum barrier CVD window. A beam launching system used to steer the microwave beam in the plasma volume is connected between the end of the transmission line and the tokamak radial and top ports. A VME based real time data acquisition and control (DAC) system is used for monitoring, acquisition and control. Hard-wired interlock operates a rail-gap based crowbar system in less than 10µs under any fault condition. Burn patterns are recorded at various stages in the transmission line. The gyrotron is tested for ∼200 kW / 1000s operation on a water dummy load. Transmission line is tested at various power levels for long pulse operation. The paper highlights the experimental results of successful commissioning of the system.

Export citation and abstract BibTeX RIS

Please wait… references are loading.
10.1088/1742-6596/25/1/013