Fast reactor programme in India

  • Published:
Pramana Aims and scope Submit manuscript

Abstract

Role of fast breeder reactor (FBR) in the Indian context has been discussed with appropriate justification. The FBR programme since 1985 till 2030 is highlighted focussing on the current status and future direction of fast breeder test reactor (FBTR), prototype fast breeder reactor (PFBR) and FBR-1 and 2. Design and technological challenges of PFBR and design and safety targets with means to achieve the same are the major highlights of this paper.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Figure 1
Figure 2
Figure 3
Figure 4
Figure 5
Figure 6
Figure 7
Figure 8
Figure 9
Figure 10

Similar content being viewed by others

Acknowledgements

The science and technology contributions by the team of scientists and engineers from IGCAR, BHAVINI, collaborating institutes and industries are sincerely acknowledged.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to P CHELLAPANDI.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

CHELLAPANDI, P., RAO, P.R.V. & KUMAR, P. Fast reactor programme in India. Pramana - J Phys 85, 525–538 (2015). https://doi.org/10.1007/s12043-015-1069-6

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s12043-015-1069-6

Keywords

PACS No.

Navigation