Practical Experience with the Introduction of Honeycomb Shroud Seals on 250 – 800 MW Supercritical Pressure Units

  • Published:
Power Technology and Engineering Aims and scope

Practical experience with the introduction of honeycomb seals in the flow-through sections of 250 – 800 MW steam turbines with supercritical steam pressure is examined. The most widespread designs for shroud and end honeycomb seals used in the development of new turbine units are discussed, along with the modernization of existing steam turbine equipment. Test stand data on the relative flow rate and power characteristics of honeycomb, radial, and axial-radial seals are compared. Results are reported from thermal tests for evaluating the efficiency of installing honeycomb shroud seals in the high pressure cylinders of the T-250_300-240 turbine units at the TÉTs-21 plant of JSC “Mosénergo” and the K-800-240-5 turbine units at the Perm GRÉS plant of JSC “OGK-1.”

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. S. V. Ushinin, “Experience with the introduction of honeycomb seals in steam turbines,” Élektr. Stantsii, No. 10, pp. 8 – 14 (2009).

  2. V. F. Rezinskikh, G. D. Avrutskii, M. A. Fedorov, and S. A. Bykov, “Extending the service life of UTMZ T-250_300-240 turbines at JSC ‘Mosénergo’,” Élektr. Stantsii, No. 6 (2006).

  3. A. G. Kostyuk, V. G. Gribin, B. N. Petrunin, A. S. Lisyanskii, K. V. Gorlitsyn, and S. V. Ushinin, “Practical experience with the introduction of honeycomb shroud seals in 60 – 800 MWturbine systems,” in: Proc. Second All-Russian Sci.-Pract. Conf. “Increasing the Operational Reliability and Efficiency of Electric Power Plants and Power Systems, ÉNERGO-2012, Izdatel’skii dom MÉI, Moscow (2012).

  4. A. G. Kostyuk, S. A. Serkov, B. N. Petrunin, and A. A. Chistov, “Experimental justification of a method for calculating the aerodynamic exciting forces in turbine machinery seals,” Teploénergetika, No. 4 (1994).

  5. G. D. Barinberg, Yu. M. Brodov, A. A. Gol’dberg, L. S. Ioffe, V. V. Kortenko, V. B. Novoselov, and Yu. A. Sakhnin, Steam Turbines and Turbine Units of the Urals Turbine Factory, Aprio, Yekaterinburg (2010).

    Google Scholar 

  6. A. M. Sakharov, V. K. Konovalov, and S. V. Ushinin, “Results of the commercial introduction of honeycomb shroud seals on 300 MW turbine units,” Élektr. Stantsii, No. 2, 33 – 38 (2010).

    Google Scholar 

  7. RD 34.20.581–96. Method for Evaluating the Engineering State of Steam Turbine Units Before and After Repairs and Between Repairs [in Russian], Approved by the Department of Science and Technology of RAO “EÉS Rossii,” December 30, 1006.

  8. Rules for Engineering Operation of Electric Power Plants and Grids in the Russian Federation [in Russian], Ministry of Energy of Russia, SPO ORGRÉS, Moscow (2003).

Download references

Author information

Authors and Affiliations

Authors

Additional information

Translated from Élektricheskie Stantsii, No. 10, October 2013, pp. 8 – 13.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Lisyanskii, A.S., Gribin, V.G., Sakhnin, Y.A. et al. Practical Experience with the Introduction of Honeycomb Shroud Seals on 250 – 800 MW Supercritical Pressure Units. Power Technol Eng 47, 440–445 (2014). https://doi.org/10.1007/s10749-014-0466-1

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10749-014-0466-1

Keywords

Navigation