The effect of rock weathering and transition zones on the performance of an EPB-TBM in complex geology near Istanbul, Turkey

  • Original Paper
  • Published:
Bulletin of Engineering Geology and the Environment Aims and scope Submit manuscript

Abstract

The new Istanbul Airport is being constructed over an old coal field area, 35 km away from the city center. The construction of a rail link between the city and the airport entails the excavation of tunnels in the areas of complex geology, creating several problems for tunnel construction. This paper summarizes the effect of different grades of weathering of an interbedded sandstone-mudstone-siltstone sequence and transition zones on the performance of an earth pressure balance tunnel boring machine (EPB-TBM) during this work. The variation of EPB pressure, TBM thrust, torque, penetration, and specific energy values were analyzed in different lithologies and weathering zones and with respect to the attitude of transition zones between different materials. Normalized thrust and torque values considered in respect of penetration rate and EPB pressure showed that the attitude of transition zone on TBM performance is strictly dependent on the position of each geologic formation in the respect to the other, inclined or horizontal. To be specific, in an inclined transition zone, the thrust and torque values were almost double compared to the values obtained in a horizontal transition zone in the same lithology. This was probably due to increased over-break in inclined transition zones, which created loose material that accumulated in front of the cutter head. However, further case studies would be required definitely to confirm this. Mean normalized thrust and torque values were almost half in moderately/highly weathered sandstone compared to fresh/slightly weathered sandstone. The highest mean penetration of 28 mm/rev and mean lowest specific energy of 2.4 kWh/m3 were obtained in transition zone between claystone with silty sand and highly weathered interbedded sandstone-mudstone-siltstone. Due to impact effects, increased disc consumption was experienced where passage was made from low strength due to high strength formations, with up to one disc per 115 m3 of excavated material in the transition zones included in the study. The relatively high production rates were achieved, which attributed to a combination of logging daily the face conditions accompanied by appropriate adjustments of soil conditioning agents (FIR-foam injection ratio and FER foam expansion ratio values) and anti-clogging agents to control the sticking behavior of the spoil. The impact of different ground conditions on EPB-TBM performance in different projects is also discussed in relation to the results obtained in this study. It is believed that this research will help to manage better mechanized tunneling activities in similar conditions.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Fig. 8
Fig. 9
Fig. 10
Fig. 11
Fig. 12
Fig. 13
Fig. 14
Fig. 15
Fig. 16
Fig. 17

Similar content being viewed by others

References

  • Altindag R (2010) Assessment of some brittleness indexes in rock drilling efficiency. Rock Mechanics and Rock Engineering 43:361–370

    Article  Google Scholar 

  • Artson Geoteknik, Engineering and Consultancy (2017) Geologic and geotechnical report prepared for New Airport 2-Kagithane Metro Stations. V1/4. p 231.

  • Babendererde S, Hoek E, Marinos P, Cardoso AS (2004) Geological risk in the use of TBMs in heterogeneous rock masses – the case of “Metro do Porto” and the measures adopted. University of Aveiro, Portugal, Conference Geotechnical Risks in Rock Tunnels, pp 1286–1329

    Google Scholar 

  • Bilgin N and Acun S (2021) Contribution on the understanding of the effect of transition zones on the performance of EPB-TBMs in complex geologic structures. Submitted to World Tunnel Conference 2021, Copenhagen.

  • Bilgin N, Çopur H, Balci C (2014) Mechanical excavation in mining and civil industries. CRC Press, Taylor and Francis Group, London 380

  • Bilgin N, Çopur H, Balcı C (2016) TBM excavation in difficult ground conditions, cases studies from Turkey. Ernst and Sohn, Germany 346

  • Bilgin N, Acun S, Ates U, Murtaza M, Çelik Y (2017) The factors affecting the performance of three different TBMs in a complex geology in Istanbul. Proceedings of the World Tunnel Congress – Surface challenges Underground solutions. Bergen, Norway, p 7

    Google Scholar 

  • Chan NF (2015) Catalogue of notable tunnel failures - case histories (up to April 2015). Prepared by Mainland East Division Geotechnical Engineering Office Civil Engineering and Development Department of Hong Kong pp 380.

  • Ilci N, Temel M, Sezgin S, Akpinar T, Guarasio S, Polat C and Bilgin N (2013) Clogging and squeezing effect of marl-clayey limestone on the performance of a hard rock TBM in Suruc Tunnel, Turkey. World Tunnel Congress 2013 Geneva Underground –the way to the future. G. Anagnostou & H. Ehrbar (eds). P7.

  • Oliveira DGG and Diederichs M (2016) TBM interaction with soil-rock transitional ground. TAC 2016 Annual Conference, Ottawa, p.1-8.

  • Oliveira DGG, Diederichs M, Thewes M, Freimann, Aguiar G (2017) EPB conditioning of mixed transitional ground: investigating preliminary aspects. Proceedings of the World Tunnel. Congress – Surface challenges – Underground solutions, Bergen, Norway

    Google Scholar 

  • Peila D, Picchio P, Chieregato A (2013) Earth pressure balance tunnelling in rock masses: laboratory feasibility study of the conditioning process. Tunnelling and Underground Space Technology 35:55–66

    Article  Google Scholar 

  • Sakallı M, Talu D, Bilgin N and Aksoy I.H (2019) Problems associated with an EPB-TBM in a complex geology with serpentinites and peridotites in Turkey, International Tunnelling and Underground Space Association (ITA AITES) World Tunnel Congress, Napoli, Italy.

  • Tóth A (2013) TBM performance evaluation in rock-soil interface mixed ground. Thèse N° 5831. PhD Thesis, EPFL, Lausanne, 316 p.

  • Tóth A, Gong Q, Zhao J (2013) Case studies of TBM tunneling performance in rock–soil interface mixed ground. Tunnelling and Underground Space Technology 38:140–150

    Article  Google Scholar 

  • Shirlaw JN (2012) Setting operating pressures for TBM tunneling. HKIE Geotechnical Division Annual Seminar, May, Geotechnical Aspects of Tunnelling for Infrastructure, at Hong Kong, p 7-28

  • Shirlaw JN (2016) Pressurized TBM tunnelling in mixed face conditions resulting from tropical weathering of igneous rock. Tunnelling and Underground Space Technology 57:225–240

    Article  Google Scholar 

  • Shirlaw JN, Ong JCW, Rosser HB, Tan CG, Osborne NH, Heslop PJE (2003) Local settlements and sinkholes due to EPB tunnelling. Geotechn. Eng. 156(4):193–211

  • Vergara IM, Saroglou C (2017) Prediction of TBM performance in mixed-face ground conditions. Tunnelling and Underground Space Technology 69:116–124

    Article  Google Scholar 

  • Zhao J, Gong QM, Eisensten Z (2007) Tunnelling through a frequently changing and mixed ground: a case history in Singapore. Tunnelling and Underground Space Technology 22(4):388–400

    Article  Google Scholar 

Download references

Acknowledgements

The authors are grateful to contractor Kolin-Kalyon-Cengiz Joint Venture (KKC Marmaray construction JV) for permitting to publish the tunneling data, and to Geologist Fevzi Polat from Artson providing the geological map in Fig. 1, and Dr John Cripps for his immense valuable effort to contribute to the improvement of the manuscript; without their help, it would be impossible to publish this paper.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Nuh Bilgin.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Bilgin, N., Acun, S. The effect of rock weathering and transition zones on the performance of an EPB-TBM in complex geology near Istanbul, Turkey. Bull Eng Geol Environ 80, 3041–3052 (2021). https://doi.org/10.1007/s10064-021-02142-4

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10064-021-02142-4

Keywords

Navigation