Skip to main content
Log in

Assessing the resource usage in scheduling with incompatibilities

  • Original Paper
  • Published:
OR Spectrum Aims and scope Submit manuscript

Abstract.

In the field of resource constrained scheduling, the papers in the literature are mainly focused on minimizing the maximum completion time of a set of tasks to be carried out, paying attention to respecting the maximum simultaneous availability of each resource type in the system. This work, instead, considers the issues of balancing the resource usage and minimizing the peak of the resources allocated each time in the schedule, while keeping the makespan low. To this aim we propose a local search algorithm which acts as a multi start greedy heuristic. Extensive experiments on various randomly generated test instances are provided. Furthermore, we present a comparison with lower bounds and known heuristics.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Massimiliano Caramia.

Additional information

Correspondence to: Massimiliano Caramia

We wish to thank the anonymous referees for their useful comments which have led to this improved version of the paper.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Caramia, M., Dell'Olmo, P. Assessing the resource usage in scheduling with incompatibilities. OR Spectrum 25, 521–547 (2003). https://doi.org/10.1007/s00291-003-0138-2

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/s00291-003-0138-2

Keywords:

Navigation