Cash flow forecasting in construction project

  • Published:
KSCE Journal of Civil Engineering Aims and scope

Abstract

This research introduces the development of a project-level cash flow forecasting model in construction stage based on the plamed earned value and the cost from a general contractors view on a jobsite. Most previous models have been developed to assist contractors in their pre-tendering or planning stage cash flow forecasts. The critical key to cash flow forecasting at the project level is how to build a cash-out model. The basic concept is to use moving weights of cost categories in a budget over project duration. The cost categories are classified to compile resources with almost the same time lags that are based on contracting payment condit ions and credit times given by suppliers or venders. For cash-in, net planned monthly-earned values are simply transferred to the ca sh-in forecast, to be applied there with billing time and retention money. Validation of the model involves applying data from on-goi ng4 projects in progress for 12 months. Based on the results of the comparative analyses through the simulation of the proposed mod el and the existing models, the proposed model is more accurate, flexible and simpler than traditional models to the employee of construction jobsite who is not oriented financial knowledge.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Ahuja, H.N. and Walsh, M.A. (1983).Successful Methods in Cost Engineering, John Wiley & Son, New York, NY.

    Google Scholar 

  • Ashley, D.B. and Teicholz, P.M. (1977). “Pre-Estimate Cash Flow Analysis.”Journal of Construction Division, ASCE, Vol. 103, No. CO3, pp. 369–379.

    Google Scholar 

  • Bennett, J. and Ormerod, R.N. (1984). “Simulation Applied to Construction Projects.”Construction Management and Economics, Vol. 2, pp. 225–263.

    Google Scholar 

  • Fondahl, J.W. and Bacarreza, R.R. (1972).Construction Contract Markup Related to Forecasted Cash Flow. Technical Report Construction Industry Institute Stanford University, CA.

    Google Scholar 

  • Gates, M. and Scarpa, A. (1979). “Preliminary Cumulative Cash Flow Analysis.”Cost Engineering, Vol. 21, No. 6, pp. 243–249.

    Google Scholar 

  • Hendrickson, C. and Au, T. (1989).Project Management For Construction: Fundamental Concepts for Owner, Engineer, Architects, and Builders, Prentice-Hill, Inc., Englewood, NJ.

    Google Scholar 

  • Jepson, W.B. (1969). “Financial Control of Construction and Reducing the Element of Risk.”Contract Journal, April, pp. 862–864.

    Google Scholar 

  • Kaka, A.P. and Price, A.D.F. (1991a). “Net Cash Flow Models: Are They Reliable?”Construction Management and Economics, Vol. 9, pp. 291–308.

    Article  Google Scholar 

  • Kaka, A.P. (1996). “Towards more Flexible and Accurate Cash Flow.”Construction Management and Economics, Vol. 14, pp. 35–44.

    Article  Google Scholar 

  • Kenley, R. and Wilson, O.D. (1989). “A Construction Project Net Cash Flow Model.”Construction Management and Economics, Vol. 7, pp. 3–18.

    Google Scholar 

  • McCaffer, R. (1979). “Cash Flow Forecasting.”Quantity Surverying, August, pp. 22–26.

    Google Scholar 

  • Meredith, J.R. and Mantel, S.J. Jr. (1995).Project Management A Management ApproachThird Edition, John Wiley & Son, Inc., New York, NY.

    Google Scholar 

  • Navon, R. (1994b). “Company-Level Cash-Flow Management.”Journal of Construction Engineering and Management, ASCE, pp. 22–29.

  • Navon, R. (1995). “Resource-based Model for Automatic Cash-Flow Forecasting.”Construction Management and Economics, Vol. 13, pp. 501–510.

    Article  Google Scholar 

  • Navon, R. (1997). “Cash-Flow Forecasting and Management.”Construction Congress Proceeding, ASCE, New York, pp. 1056–1063.

  • Oberlender, G.D. (2000).Project Management for Engineering and ConstructionSecond Edition, McGraw-Hill, New York, NY.

    Google Scholar 

  • Park, H.K. (2001).Cash Flow Forecasting Model Using Moving Weights of Cost Categories For General Contractors on Jobsite, Ph.D. dissertation, University of Wisconsin, Madison, Wisconsin, USA.

    Google Scholar 

  • Peer, S. (1982). “Application of Cost-Flow Forecasting Models.”Journal of the Construction Division, Proceedings of ASCE, Vol. 108, No. CO2, pp. 226–232.

    Google Scholar 

  • Peterman, G.G. (1973). “A Way to Forecast Cash Flow.”World Construction, October, pp. 17–22.

    Google Scholar 

  • Reinschmidt, K.F. and Frank, W.E. (1976). “Construction Cash Flow Management System.”Journal of the Construction Division, Proceedings of ASCE, Vol. 102, No. CO4, pp. 615–627.

    Google Scholar 

  • Russell, J.S. (1991). “Contractor Failure: Analysis.”Journal of Performance of Construction Facilities, ASCE, Vol. 5, No. 3, pp. 163–180.

    Article  Google Scholar 

  • Sears, G.A. (1981). “CPM/COST: An Integrated Approach.”Journal of the Construction Division, Proceedings of the ASCE, Vol. 107, No. CO2, pp. 227–238.

    MathSciNet  Google Scholar 

  • Singh, S. and Lakanathan, G. (1992). “Computer-Based Cash Flow Model.”Proceeding 36th Annual Trans., AM. Assoc. of Cost Engineers, AACE, R.5.1-R.5.14.

  • Trimble, R.G. (1982). Micro Computers in Construction Management.Building Technology and Management, Vol. 2, No. 2, pp. 11–13.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Hyung-Keun Park Ph.D..

Rights and permissions

Reprints and permissions

About this article

Cite this article

Park, HK. Cash flow forecasting in construction project. KSCE J Civ Eng 8, 265–271 (2004). https://doi.org/10.1007/BF02836008

Download citation

  • Received:

  • Accepted:

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02836008

Keywords

Navigation