Skip to main content
Log in

Reconstruction and strengthening of tenement foundations

  • Technology and Work Production
  • Published:
Soil Mechanics and Foundation Engineering Aims and scope

Abstract

Experience is described for the reconstruction and strengthening of the strip foundations of a tenement building and the stepwise installation of a new foundation; installation of reinforced-concrete casing walls along the lateral surfaces of existing foundations over their entire height; and, the gluting of waterproofing along the lower surface and lateral walls of the new sections of the foundations and reinforced-concrete casing walls.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Authors

Additional information

Translated from Osnovaniya, Fundamenty i Mekhanika Gruntov, No. 3, pp. 23–26, May–June, 1998.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Krutov, V.I., Kovalev, A.S. Reconstruction and strengthening of tenement foundations. Soil Mech Found Eng 35, 92–96 (1998). https://doi.org/10.1007/BF02465916

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02465916

Keywords

Navigation