Abstract
The experience in the installation of modern digital systems for controlling converter units at the Vyborg converter substation on the basis of advanced microprocessor devices is considered. It is shown that debugging of a control and protection system on mathematical and physical models does not guarantee optimum control of actual converter devices. Examples of advancing the control and protection system are described, the necessity for which has become obvious in tests of actual equipment. Comparison of oscillograms of processes before optimization of the control system and after its optimization and adjustment shows that the digital control system makes it possible to improve substantially the algorithms of control and protection in the short term and without changing the hardware component.
Similar content being viewed by others
Author information
Authors and Affiliations
Additional information
__________
Translated from Élektricheskie Stantsii, No. 12, December 2005, pp. 49–54.
Rights and permissions
About this article
Cite this article
Gusakovskii, K.B., Zmaznov, E.Y., Katantsev, S.V. et al. Experience in the installation of a microprocessor system for controlling converter units of the Vyborg substation. Power Technol Eng 40, 65–70 (2006). https://doi.org/10.1007/s10749-006-0022-8
Issue Date:
DOI: https://doi.org/10.1007/s10749-006-0022-8