Abstract
In this paper, we propose an approximation for the variability of the inter-departure times of finished products in an assembly line with finite buffers, converging flow of material, and general service times. We use the coefficient of variation as the relevant measure of variability. Exact procedures are not available for that case. The quality of the proposed approximation is tested against the results of various simulation experiments.
Similar content being viewed by others
References
Altıok TM (1997) Performance analysis of manufacturing systems. Springer series in operations research. Springer, New York
Buzacott JA, Liu X-G, Shanthikumar JG (1995) Multistage flow line analysis with the stopped arrival queue model. IIE Trans 27(4): 444–455
Buzacott JA, Shanthikumar JG (1993) Stochastic models of manufacturing systems. Prentice-Hall, Englewood Cliffs
Carrascosa M (1995) Variance of the output in a deterministic two-machine line. Master thesis, Laboratory for Manufacturing and Productivity, Massachusetts Institute of Technology, Cambridge
Colledani M, Tolio T (2006) Impact of statistical process control (SPC) on the performance of production systems. Ann CIRP 55(1): 453–458
Dallery Y, Gershwin SB (1992) Manufacturing flow line systems: A review of models and analytical results. Queueing Theory 12: 3–94
Duenyas I, Hopp WJ (1990) Estimating variance of output from cyclic exponential queueing systems. Queueing Systems 7: 337–353
Gaver DP (1962) A waiting line with interrupted service, including priorities. J R Stat Soc 24(2): 73–90
Gershwin SB (1987) An efficient decomposition method for the approximate evaluation of tandem queues with finite storage space and blocking. Oper Res 35(2): 291–305
Gershwin SB (1993) Variance of output of a tandem production system. In: Onvural RD, Akyildiz IF (eds) Queueing networks with finite capacity. North-Holland, Elsevier Science Publishers, pp 291–304
Gershwin SB (1994) Manufacturing systems engineering. Prentice-Hall, Englewood Cliffs
He X-F, Wu S, Li Q-L (2007) Production variability of production lines. Int J Prod Econ 107(1): 78–87
Helber S (1999) Performance analysis of flow lines with non-linear flow of material, vol 473 of Lecture Notes in Economics and Mathematical Systems. Berlin, Heidelberg, Springer, New York
Hendricks KB (1992) The output processes of serial production lines of exponential machines with finite buffers. Oper Res 40(6): 1139–1147
Hendricks KB, McClain JO (1993) The output processes of serial production lines of general machines with finite buffers. Manage Sci 39(10): 1194–1201
Kalir AA, Sarin SC (2009) A method for reducing inter-departure time variability in serial production line. Int J Prod Econ 120: 340–347
Kuhn H (1998) Fließproduktionssysteme—Leistungsbewertung, Konfigurations- und Instandhaltungsplanung, Volume 67 of Physica-Schriften zur Betriebwirtschaft. Physica, Heidelberg
Levantesi R, Matta A, Tolio T (2003) Performance evaluation of continuous production lines with machines having different processing times and multiple failure modes. Perform Eval 51(2–4): 247–268
Li J (2005) Overlapping decomposition: a system-theoretic method for modeling and analysis of complex manufacturing systems. IEEE Trans Autom Sci Eng 2(1): 40–54
Li J, Meerkov DM (2007) Production systems engineering. WingSpan Press, Livermore
Manitz M (2008) Queueing-model based analysis of assembly lines with finite buffers and general service times. Comput Oper Res 35(8): 2520–2536
Papadopoulos HT, Heavey C, Browne J (1993) Queueing theory in manufacturing systems analysis and design. Chapman & Hall, London
Sabuncuoglu I, Erel E, Kok AG (2002) Analysis of assembly systems for interdeparture time variability and throughput. IIE Trans 34(1): 23–40
Tan B (1999) Variance of the output as a function of time: production line dynamics. Eur J Oper Res 117: 470–484
Tan B (2000) Asymptotic variance rate of the output in production lines with finite buffers. Ann Oper Res 93: 385–403
Tempelmeier H, Bürger M (2001) Performance evaluation of unbalanced flow lines with general distributed processing times, failures and imperfect production. IIE Trans 33(4): 293–302
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Manitz, M., Tempelmeier, H. The variance of inter-departure times of the output of an assembly line with finite buffers, converging flow of material, and general service times. OR Spectrum 34, 273–291 (2012). https://doi.org/10.1007/s00291-010-0216-1
Published:
Issue Date:
DOI: https://doi.org/10.1007/s00291-010-0216-1