Abstract
Scheduling is a complex problem which occurs often in a manufacturing environment. There are many possible variations within the context of a scheduling problem, enough to overwhelm anyone but an expert. A production manager, faced with the task of job scheduling for a particular process, might well benefit from the advice of a scheduling expert. Even though the scheduling literature is full of optimizing rules for a variety of manufacturing environments few, if any, of these rules have been used in practice. The bewildering variety of theoretical results, the lack of a mechanism to match theoretical results to practical problems and the difficulty in establishing the practical efficacy of the theoretical results are among the reasons for this gap between scheduling theory and practice. This paper describes a scheduling expert system framework which addresses these problems and helps bridge this gap. The solution techniques available in SCHEDEX produce a specific schedule for the problem according to a procedure which has been mathematically proven to provide a satisfactory and often optimal solution, given the criteria for the problem. A simulation model also tests for the effectiveness of a selected technique with respect to the chosen performance measure(s).
Similar content being viewed by others
References
Alexander, S. (1987), ‘An Expert System for the Selection of Scheduling Rules in a Job Shop’,Computers & Industrial Engineering 12, 167–171.
Fox, M. and Smith, S. (1984) ‘ISIS — A Knowledge Based System for Factory Scheduling’,Expert Systems 1, 25–49.
Kanet, J. and Adelsberger, H. (1987) ‘Expert Scheduling in Production Scheduling’,European Journal of Operational Research 29, 51–59.
Kusiak, A. (1987), ‘Designing Expert Systems for Scheduling of Automated Manufacturing’,Industrial Engineering 19, 42–46.
Kusiak, A. (1989)Intelligent Manufacturing Systems. Prentice Hall, Englewood Cliffs, NJ.
Kusiak, A. and Chen, M. (1989) ‘Expert Systems for Planning and Scheduling Manufacturing Systems’,European Journal of Operational Research 34, 113–130.
Panwalkar, S. and Iskabnder, W. (1977) ‘Survey of Scheduling Rules’,Operations Research 25, 45–61.
Rao, H. and Lingaraj, B. (1988) ‘Expert Systems in Production and Operations Management: Classifications and Prospects’,Interfaces 18, 80–91.
Sen, T. and Gupta, S. (1984) ‘A State-of-the-Art Survey of Static Scheduling Research Ideas involving Due Dates’,OMEGA 12, 63–67.
Author information
Authors and Affiliations
Rights and permissions
About this article
Cite this article
Johnson, L.M., Dileepan, P. & Sen, T. Knowledge based scheduling systems: a framework. J Intell Manuf 1, 117–123 (1990). https://doi.org/10.1007/BF01472508
Issue Date:
DOI: https://doi.org/10.1007/BF01472508