Abstract
The construction industry all over the world has to face a major challenge of cost and time overruns repeatedly from commencement to completion of the project. These overruns result in huge losses in terms of cost and time. This study focusses on the in-depth analysis of the overrun factors affecting construction projects. A total of 44 overrun factors were identified from the literature and were categorized into four major categories, namely project related, management related, legal-constraints faced and site-resource related. A questionnaire was developed using these factors and was filled by 105 respondents. Relative importance index was used to rank different factors according to their criticality in overruns. For statistical analysis, Minitab was used. The most critical overrun factors identified were, namely delay in obtaining permission from authorities, poor supervision and site management, unrealistic time schedule, unforeseen ground conditions and lack of skilled professionals. This research will help researchers, engineers, project managers, construction practitioners, etc. to deal with overrun factors in an effective manner such that projects can be completed within a specific allocated cost and time.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Le-Hoai L, Dai Lee Y, Lee JY (2008) Delay and cost overruns in Vietnam large construction projects: a comparison with other selected countries. KSCE J Civ Eng 12(6):367–77. https://doi.org/10.1007/s12205-008-0367-7
Olawale YA, Sun M (2010) Cost and time control of construction projects: inhibiting factors and mitigating measures in practice. Constr Manage Econ 28(5):509–26. https://doi.org/10.1080/01446191003674519
Larsen JK, Shen GQ, Lindhard SM, Brunoe TD (2016) Factors affecting schedule delay, cost overrun, and quality level in public construction projects. J Manage Eng 32(1):04015032. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000391
Flyvbjerg B, Holm MS, Buhl S (2002) Underestimating costs in public works projects: error or lie? J Am Plann Assoc 68(3):279–95. https://doi.org/10.1080/01944360208976273
Assaf SA, Al-Hejji S (2006) Causes of delay in large construction projects. Int J Project Manage 24(4):349–57. https://doi.org/10.1016/j.ijproman.2005.11.010
Sharma S, Gupta AK (2019) Risk identification and management in construction projects: literature review. Int J Human Arts Soc Sci 5(6):224–231. https://doi.org/10.20469/ijhss.5.20002-6
Doloi H, Sawhney A, Iyer KC, Rentala S (2012) Analysing factors affecting delays in Indian construction projects. Int J Project Manage 30(4):479–89. https://doi.org/10.1016/j.ijproman.2011.10.004
Yang JB, Wei PR (2010) Causes of delay in the planning and design phases for construction projects. J Arch Eng 16(2):80–83. https://doi.org/10.1061/(ASCE)1076-0431(2010)16:2(80)
Kazaz A, Ulubeyli S, Tuncbilekli NA (2012) Causes of delays in construction projects in Turkey. J Civ Eng Manage 18(3):426–35. https://doi.org/10.3846/13923730.2012.698913
Doloi H (2013) Cost overruns and failure in project management: Understanding the roles of key stakeholders in construction projects. J Constr Eng Manage 139(3):267–79. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000621
Ahsan K, Gunawan I (2010) Analysis of cost and schedule performance of international development projects. Int J Project Manage 28(1):68–78. https://doi.org/10.1016/j.ijproman.2009.03.005
Sharma S, Gupta AK (2020) Identification and management of risk in building and infrastructure projects. J Constr Eng Technol Manage 10(2):1–9
Abd El-Karim MS, Mosa El Nawawy OA, Abdel-Alim AM (2017) Identification and assessment of risk factors affecting construction projects. HBRC J 13(2):202–216. https://doi.org/10.1016/j.hbrcj.2015.05.001
Sambasivan M, Deepak TJ, Salim AN, Ponniah V (2017) Analysis of delays in Tanzanian construction industry. Eng Constr Arch Manage. https://doi.org/10.1108/ECAM-09-2015-0145
Iyer KC, Jha KN (2005) Factors affecting cost performance: evidence from Indian construction projects. Int J Project Manage 23(4):283–295. https://doi.org/10.1016/j.ijproman.2004.10.003
Akintoye A (2000) Analysis of factors influencing project cost estimating practice. Constr Manage Econ 18(1):77–89. https://doi.org/10.1080/014461900370979
Kaming PF, Olomolaiye PO, Holt GD, Harris FC (1997) Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Constr Manage Econ 15(1):83–94. https://doi.org/10.1080/014461997373132
Choudhry RM, Aslam MA, Hinze JW, Arain FM (2014) Cost and schedule risk analysis of bridge construction in Pakistan: establishing risk guidelines. J Constr Eng Manage 140(7):04014020. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000857
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2021 The Author(s), under exclusive license to Springer Nature Singapore Pte Ltd.
About this paper
Cite this paper
Sharma, S., Gupta, A.K. (2021). Analysis of Factors Affecting Cost and Time Overruns in Construction Projects. In: Kumar Shukla, S., Raman, S.N., Bhattacharjee, B., Bhattacharjee, J. (eds) Advances in Geotechnics and Structural Engineering. Lecture Notes in Civil Engineering, vol 143. Springer, Singapore. https://doi.org/10.1007/978-981-33-6969-6_6
Download citation
DOI: https://doi.org/10.1007/978-981-33-6969-6_6
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-33-6968-9
Online ISBN: 978-981-33-6969-6
eBook Packages: EngineeringEngineering (R0)