Skip to main content

Use a Balanced Scorecard to Evaluate Business Processes of Sichuan Electric Power Company

  • Conference paper
  • First Online:
Proceedings of the Seventh International Conference on Management Science and Engineering Management

Part of the book series: Lecture Notes in Electrical Engineering ((LNEE,volume 242))

Abstract

Since the electric power industries throughout the world are undergoing enormous restructuring processes resulting in fiercer competitions than ever, it is necessary for electric power companies, especially Sichuan Electric Power Com- pany (SEPC) as an important part of South China Power Grid Company, to make suitable and feasible strategy for their development. The objective of this study is to construct an approach based on the analytic hierarchy process (AHP) and bal- anced scorecard (BSC) for evaluating SEPC performance, aiming at acting as a ref- erence to electric power industry. The BSC concept is applied to define the hierarchy with four major perspectives (i.e. financial, customer, internal business process, and learning and growth), and performance indicators are selected for each perspective. And then the AHP is used to determine the indicator weights. The results provide guidance to electric power company in the electric power industry in China regarding strategies for improving business process performance. Finally, some suggestions are given for improving the SEPC business processes.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 169.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 219.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Fox-Penner PS (1997) Electric utility restructuring: A guide to the competitive era. Public Utilities Reports

    Google Scholar 

  2. Yu C, Zhang S, Wang X et al (2010) Modeling and analysis of strategic forward contracting in transmission constrained power markets. Electric Power Systems Research 80(3):354–361

    Google Scholar 

  3. Wen F, David A (2001) Strategic bidding for electricity supply in a day-ahead energy market. Electric Power Systems Research 59(3):197–206

    Google Scholar 

  4. Kang DJ, Kim BH, Hur D (2007) Supplier bidding strategy based on non-cooperative game theory concepts in single auction power pools. Electric Power Systems Research 77(5):630–636

    Google Scholar 

  5. Abran A, Buglione L (2003) A multidimensional performance model for consolidating bal- anced scorecards. Advances in Engineering Software 34(6):339–349

    Google Scholar 

  6. Kaplan R, Norton D (1992) The balanced scorecardłmeasures that drive performance. Har- vard Business Review 70(1):71–79

    Google Scholar 

  7. Martinsons M, Davison R, Tse D (1999) The balanced scorecard: A foundation for the strate- gic management of information systems. Decision Support Systems 25(1):71–88

    Google Scholar 

  8. Subramanian N, Ramanathan R (2012) A review of applications of analytic hierarchy process in operations management. International Journal of Production Economics 138(2):215–241

    Google Scholar 

  9. Liberatore MJ, Nydick RL (2008) The analytic hierarchy process in medical and health care decision making: A literature review. European Journal of Operational Research 189(1):194–207

    Google Scholar 

Download references

Acknowledgments

This research was supported by the Key Program of NSFC (Grant No.70831005) and “985” Program of Sichuan University “Innovative Research Base for Economic Development and Management”.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Yanfang Ma .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2014 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Ma, Y. (2014). Use a Balanced Scorecard to Evaluate Business Processes of Sichuan Electric Power Company. In: Xu, J., Fry, J., Lev, B., Hajiyev, A. (eds) Proceedings of the Seventh International Conference on Management Science and Engineering Management. Lecture Notes in Electrical Engineering, vol 242. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-40081-0_94

Download citation

Publish with us

Policies and ethics