Skip to main content

Research on Railway Tunnel Construction Scheduling Technique Based on LSM

  • Conference paper
  • First Online:
LTLGB 2012
  • 2012 Accesses

Abstract

This paper analyzed the lack of schedule techniques for railway tunnel construction project. According to the linear project characteristics of the railway tunneling, attribute data standard for linear schedule of railway tunnel project have been studied. Moreover, an algorithm of railway tunnel project scheduling based on the Linear scheduling method is given. The algorithm is applied to an example of railway tunnel project to validate its effect.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 169.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Similar content being viewed by others

References

  • Chrzanowski EN, Johnson DW (1986) Application of linear scheduling[J]. J Constr Eng Manag ASCE 112(4):476–491

    Google Scholar 

  • Harmelink DJ (1995) Linear scheduling model: the development of a linear scheduling model with micro computer applications for highway construction project control. Ph.D. thesis, Iowa State University, Ames, Iowa

    Google Scholar 

  • Harmelink DJ, Rowings JE (1998) Linear scheduling model: development of controlling activity path. J Constr Eng Manag 124(4):263–268

    Google Scholar 

  • Hassanem A (2002) Planning and scheduling highway construction using GIS and dynamic programming. Ph.D. thesis, Concordia University Montreal, Quebec, Canada

    Google Scholar 

  • Johnston D (1981) Linear scheduling method for highway construction[J]. J Constr Eng Manag ASCE 107(2):247–261

    Google Scholar 

  • Kris G, Mattila AM ASCE, Amy Park (2003) Comparison of linear scheduling model and repetitive scheduling method. J Constr Eng Manag 129(1):56–64

    Google Scholar 

  • Mubarak S (2010) Construction project scheduling and control. Wiley, Hoboken, pp 287–288

    Google Scholar 

  • Vorster MC, Beliveau YJ, Bafna T (1992) Linear scheduling and visualization. Transp. Res. Rec. 1351, Transportation Research Board, Washington, D.C. (1992) pp 32–39

    Google Scholar 

  • Yamín RA, Harmelink DJ (2001) Comparison of linear scheduling model (LSM) and critical path method (CPM). J Constr Eng Manag 112(4):476–491

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Liqiang Liu .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2013 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Liu, L., Liu, Y., Tang, Y., Li, Q. (2013). Research on Railway Tunnel Construction Scheduling Technique Based on LSM. In: Chen, F., Liu, Y., Hua, G. (eds) LTLGB 2012. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-34651-4_120

Download citation

Publish with us

Policies and ethics