Skip to main content

Research on Space-Time Prediction Model and Criteria for High Altitude Slope in the First Stage Jinping Hydropower Station

  • Conference paper
Geotechnical Engineering for Disaster Mitigation and Rehabilitation
  • 2733 Accesses

Abstract

Landslide is one of the ubiquitous geological disasters, and calamity brought by landslide often is shocking by sight. In order to avoid or alleviate the disasters brought by landslide, it is feasible to predicate and take effective measures for landslide in advance. At the present time, scholars in home and abroad have brought forward many prediction models, methods and criteria. All of them are focusing on the prediction of where, when and the intensity (destroy intensity of landslides) of landslides will happen. Prediction methods and criteria are the key contents in the landslide forecasting and prediction. Based on the summarization of the productions of landslide prediction, this paper systematically investigates the applicability of these predictions in depth. And based on the monitoring fruits of left bank high altitude slope in the first stage Jinping hydropower station, time-space comprehensive prediction is proposed and a comprehensive prediction model and criteria adaptive to high altitude slope in the first stage Jinping hydropower station is designed. It is useful to build a forewarning system for potential slope failure.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 309.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  • Hu Houtian. (2001). Landslide geological hazard forecast Southwest Jiaotong University Press.

    Google Scholar 

  • Hu Gaoshe, Men Yuming, Liu Yuhai et al. (1996). Study on prediction criterion of Xintan landslide. The Chinese Journal of Geological Hazard and Control, 7 supplement, 67–72.

    Google Scholar 

  • Li Xiuzhen, Xu Qiang, Huang Runqiu, et al.(2003). Research on prediction criterion for temporary prediction of landslide. The Chinese Journal of Geological Hazard and Control, 4(14): 5–11.

    Google Scholar 

  • Wu Shuren, Jin Yimin, Shi Jusong. (2004). A primary study on landslide warning criterion-An example from the reservoir region of the Three Gorges. Journal of Jilin University (Earth Science Edition), 4(34): 596–600.

    Google Scholar 

  • Yin Kunlong. (2003). Classification of landslide hazard prediction and warning. The Chinese Journal of Geological Hazard and Control, 4(14): 12–17

    Google Scholar 

  • Zhang Zhuoyuan, Wang Shitian, Wang Lansheng. (1994). Principles of Engineering Geology Analysis, 2nd Edition, Geological Publishing House.

    Google Scholar 

  • Zhou Zhong, Gong Manfu, Lei Chengdi. (2006). Research on stability of slope at left abutment of Jinping first stage hydropower station. Chinese Journal of Rock Mechanic and Engineering, 11(25): 2298–2304.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2008 Science Press Beijing and Springer-Verlag GmbH Berlin Heidelberg

About this paper

Cite this paper

Jin, H., Xu, W. (2008). Research on Space-Time Prediction Model and Criteria for High Altitude Slope in the First Stage Jinping Hydropower Station. In: Liu, H., Deng, A., Chu, J. (eds) Geotechnical Engineering for Disaster Mitigation and Rehabilitation. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-540-79846-0_109

Download citation

Publish with us

Policies and ethics