Skip to main content

Development of a Metallurgical Process for Eramet’s Mabounié Nb-REE Project

  • Conference paper
  • First Online:
Extraction 2018

Abstract

ERAMET, through its subsidiary COMILOG, have rights to a rich niobium and rare earth deposit in Gabon. The Mabounié deposit, is located 50 km from the town of Lambaréné, in a fairly remote location. ERAMET has been developing a process to recover value metals for several years, and approached Hatch Ltd. to design a sizeable Demonstration Plant to help them further optimize the process, and prove the flowsheet is technically viable. The process employs concentration techniques to recover an upgraded Nb/REE feed material for processing in the subsequent leach step. Rare earths and niobium are selectively leached, and subsequently precipitated. Following precipitation , rare earths undergo bulk separation and are purified to produce LRE and mixed MRE/HRE products, which will be further processed by Third Parties. This paper provides a high-level overview of the process, summarizes the motivation for a Demonstration Plant in the vicinity of the deposit, and discusses technical challenges faced during the flowsheet definition and design phase. Key challenges are focused on and summaries of the methodologies used to address each challenge, as well as the solutions to overcome the challenges, are discussed. The paper provides motivation for further process simplification and concludes with a project update.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 189.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 249.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 329.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Beltrami D, Belair S (2016) Maboumine project: a hydrometallurgical process for the recovery of rare earth elements from a polymetallic ore deposit in gabon. In: XXVIII international mineral processing congress, REE symposium, IMPC 2016, QC, Canada

    Google Scholar 

  2. Donati L, Courtaud B, Weigel V (2014) Maboumine process: a promising process for developing a polymetallic ore deposit—focus on the upstream part of the process. In: Proceedings of hydrometallurgy 2014, BC, Canada

    Google Scholar 

  3. Belair S, Weigel V (2014) Maboumine process: a promising process for developing a polymetallic ore deposit—focus on the downstream part of the process. In: REE symposium, COM 2014—conference of metallurgists proceedings, BC, Canada

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to G. Nazari .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2018 The Minerals, Metals & Materials Society

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Nazari, G. et al. (2018). Development of a Metallurgical Process for Eramet’s Mabounié Nb-REE Project. In: Davis, B., et al. Extraction 2018. The Minerals, Metals & Materials Series. Springer, Cham. https://doi.org/10.1007/978-3-319-95022-8_198

Download citation

Publish with us

Policies and ethics