Skip to main content

The Life Cycle of a CSOP Investment: Sample Calculation for a German Wind Turbine

  • Chapter
  • First Online:
  • 2004 Accesses

Abstract

The sample calculations in this chapter illustrate the life cycle of a CSOP. They are based on the German Renewable Energy Act before the 2017 reform. This reform ushered the transition from a plain feed-in tariff (FIT) system to a tendering-based scheme. The main differences with regard to projects of a size that now fall under a tender scheme, as the example for the wind turbine below, are twofold: (1) investors interested in a project now need to bid for the contract, that is, they offer to implement the project based on an individually agreed FIT—the bids are those tariffs. Thus, the lowest bidder wins the procurement contract and later operates on the agreed FIT. (2) winners are no longer allowed to self-use the produced energy—all produced electricity has to be fed into the electricity system. While this contradicts the prosumer idea, for the sample calculations, both differences are unimportant: Firstly, instead of referring to the FIT as stipulated by in the Renewable Energy Act, the FIT that was determined in the tender applies. Secondly, RE-CSOPs are now lucrative if and only if the investors decide to sell the entire energy production. However, this has been the assumption of many simulated RE-CSOP implementations before; the following model calculations will illustrate why. Nonetheless, it should be noted that this circumstance is a specific feature of the recent German renewable energy policy, not having universal validity for other countries, either in the EU or worldwide.

This is a preview of subscription content, log in via an institution.

Buying options

Chapter
USD   29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD   149.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Hardcover Book
USD   199.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Learn about institutional subscriptions

Notes

  1. 1.

    These are wind turbine, foundations, transport, transfer station, connection to the grid, accessibility, planning, tax and legal advices, as well as all unforeseen costs.

  2. 2.

    In Germany, the utility is obligated by the law to buy the electricity and to pay for it, as determined by § 49 I and II, EEG 2014.

  3. 3.

    Additional information is available at KfW (n.d.).

References

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Carsten Croonenbroeck .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2019 The Author(s)

About this chapter

Check for updates. Verify currency and authenticity via CrossMark

Cite this chapter

Croonenbroeck, C., Slevec, P. (2019). The Life Cycle of a CSOP Investment: Sample Calculation for a German Wind Turbine. In: Lowitzsch, J. (eds) Energy Transition. Palgrave Macmillan, Cham. https://doi.org/10.1007/978-3-319-93518-8_9

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-93518-8_9

  • Published:

  • Publisher Name: Palgrave Macmillan, Cham

  • Print ISBN: 978-3-319-93517-1

  • Online ISBN: 978-3-319-93518-8

  • eBook Packages: Economics and FinanceEconomics and Finance (R0)

Publish with us

Policies and ethics